Difference between revisions of "20190320-Analyzer-Mtg"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...")
 
 
Line 14: Line 14:
 
== Agenda ==
 
== Agenda ==
 
#[https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist]
 
#[https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist]
#*   
+
#*  What do we need to do before we're ready to respin all of the concurrent running
 +
#**  Look at the event cuts---Tao
 +
#**  SAM pedestals---Tao and Devi  (Tao has found different beam-dependent pedestals, should we use those or just the beam-off peds?)
 +
#**  Do we need to mess with beamline pedestals?  Not for this pass.
 +
#**  We'd like to have a run-summary tree---Cameron
 +
#**  We want to have the post-pan regression feeding in into the run-summary tree (or friend-able)---Cameron
 
# "Operations" branch
 
# "Operations" branch
#*  
+
#* Get local panguin changes pushed up to git hub
 +
#*  When doing merge of operations into develop, keep the develop panguin sources if there are conflicts
 
# Pull requests
 
# Pull requests
#*  
+
#* We'll merge from operations ot develop soon
 +
#* Also soon merge from develop back to master; but first need the online mode updated to be merged into develop
 
# online plots  
 
# online plots  
 
#*  
 
#*  
Line 26: Line 33:
 
#*   
 
#*   
 
# feedback
 
# feedback
#*   
+
#* Amali has a version that does accumulate the asymmetry and can prepare changes for the 8 pockels cell settings
 +
# Aggregation
 +
#*  Cameron is working on a script to develop a "run-average" rootfile from the mul tree
 +
#*  He will later work on pulling the
 
# VQWK adcs
 
# VQWK adcs
 
#*   
 
#*   
 
# DAQ issues
 
# DAQ issues
 
#*   
 
#*   
 +
#*  bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed
 +
#*  greenmonster:  there needs to be ways to set all the VQWKs/timing boards/etc consistently.
 
# Other issues
 
# Other issues
#*   
+
#*  Can we set a short integration window (50-100 us) and then scan the VQWK gate delay to find the tune-mode beam, or would we need to use the timing board for this purpose?
  
 
== Bob's DAQ tasklist ==
 
== Bob's DAQ tasklist ==

Latest revision as of 14:18, 20 March 2019

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

  1. runlist
    • What do we need to do before we're ready to respin all of the concurrent running
      • Look at the event cuts---Tao
      • SAM pedestals---Tao and Devi (Tao has found different beam-dependent pedestals, should we use those or just the beam-off peds?)
      • Do we need to mess with beamline pedestals? Not for this pass.
      • We'd like to have a run-summary tree---Cameron
      • We want to have the post-pan regression feeding in into the run-summary tree (or friend-able)---Cameron
  2. "Operations" branch
    • Get local panguin changes pushed up to git hub
    • When doing merge of operations into develop, keep the develop panguin sources if there are conflicts
  3. Pull requests
    • We'll merge from operations ot develop soon
    • Also soon merge from develop back to master; but first need the online mode updated to be merged into develop
  4. online plots
  5. pair analysis
  6. regression analysis
  7. feedback
    • Amali has a version that does accumulate the asymmetry and can prepare changes for the 8 pockels cell settings
  8. Aggregation
    • Cameron is working on a script to develop a "run-average" rootfile from the mul tree
    • He will later work on pulling the
  9. VQWK adcs
  10. DAQ issues
    • bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed
    • greenmonster: there needs to be ways to set all the VQWKs/timing boards/etc consistently.
  11. Other issues
    • Can we set a short integration window (50-100 us) and then scan the VQWK gate delay to find the tune-mode beam, or would we need to use the timing board for this purpose?

Bob's DAQ tasklist

 TO-DO list for Parity DAQ
   updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13
Tao & Cameron: 8, 9
Bob: 3, 6, 10
Cip, Cameron, Tao: 13  
1 Doing - Timing: mostly understood, still small mysteries (LNE)
2 Doing - Synchronization-check system. w/help from Ed Jastrzembski
5 To Do - Clean up cabling, labels, fasteners - First need to examine all signals
6 Clean up CRL -- eliminate so-called "dirty trick"
7 Check the 7200 scaler setup at injector, find a spare 7200.
8 Doing - Pedestal studies, aka cross-talk.  
10 Green Monster maintenance.
11 Doing - Test spares.  Repair bad modules.
12 Doing - Document everything.  Circuit diagrams, cable map, "how to".
13 Online software, a bit undefined since software is changing.
    (a) automatic production of run-dependent database
    (b) alarms like end-of-run voice (Bob)
    (c) feedback
    (d) coil-pulsing aka modulation aka dithering (Victoria)
    (e) panguin (GUI showing real-time plots)
    (f) prompt analysis
    (g) e-logbook entries 
    (h) archiving EPICs data


Present

Excused