This has the <font color="blue">previous daily run plans</font>, i.e. prior to a cutoff date.  The more recent run plans are found here: &nbsp; [[RunPlanDaily] Daily Run Plan]
+
[[PREX I Run Plans]]
 
 
{| border="1"
 
|+ Daily Run Plan for PREX &nbsp; <font color="blue">(latest at bottom)</font>
 
! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!---&nbsp;Status&nbsp;---
 
|-
 
| 03/19
 
| Day
 
| pump down; Møller, Compton, septum install; Q2 repair<br />
 
Insert sieve. (Techs)
 
|done
 
|-
 
| 03/19
 
| Swing
 
| Beam restore (B-team)
 
| done
 
|-
 
| 03/20
 
| Owl
 
|
 
* Septum checkout (Michaels: Page when beam imminent & spectrometer ready)
 
also:
 
* Initial look at low current cavity monitors (Ahmed: Page when beam imminent & spectrometer ready)
 
* Target alignment (Michaels)
 
* VDC checkout (Michaels)
 
* Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)
 
* GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)
 
| done
 
----
 
All at 1-2 µA.<br />
 
Scattered energy ~ beam energy = 1.063 GeV.<br />
 
Quad settings:
 
*Right arm:
 
** Q1: dI/dP= 411.2474 Amps/GeV/c
 
** Q2: dI/dP= 436.2014 Amps/GeV/c
 
** Q3: dI/dP= 433.3897 Amps/GeV/c
 
* Left Arm:
 
** Q1: dI/dP= 419.8772 Amps/GeV/c
 
** Q2: dI/dP= 435.6273 Amps/GeV/c
 
** Q3: dI/dP= 434.9682 Amps/GeV/c
 
"Usual" polarity
 
|-
 
| 03/20
 
| Day
 
| Beam off & hall open 9:00 am<br />
 
Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs)
 
| done
 
|-
 
| 03/20
 
| Swing
 
|
 
* Close up hall
 
* Benesch tuning (1/2 - 2 hours)
 
* Verify quad polarities (Camsonne)
 
* Cavity monitors basic function test (Ahmed)
 
* Low current cavity monitors setup (Musson, Ahmed)
 
| done
 
|-
 
| 3/21
 
| Owl
 
|
 
* Low current cavity monitors setup (Musson, Ahmed)
 
* Access for GEM installation (Camsonne)
 
| done but GEMs not ready
 
|-
 
| 3/21
 
| Day
 
|
 
* Spectrometer checkout:
 
** Quartz detectors checkout (McNulty, Wexler)
 
** Lumi checkout (Mercado) (2 µA on Ta)
 
** GEM checkout (Camsonne?)
 
* A line tuning (Benesch)
 
* Raster checkout
 
* Access:
 
** Low current cavities
 
** Target position
 
** Quartz
 
** Scintillator alignment
 
** LQ2
 
| done
 
|-
 
| 3/21
 
| Swing
 
|
 
* Low current cavity monitors setup (Michaels, Ahmed)
 
* Remove sieves
 
* Initial look at sieve out data
 
* Replace sieves
 
| done
 
|-
 
| 3/22
 
| Owl
 
|
 
* Pointing measurement (Riordan)
 
* Remove sieves
 
* Repeat pointing measurements with no sieves
 
* If done or unable to continue before 4 am page Luis Mercado to do lumi checks
 
* After 4 am page Dustin McNulty for detector work
 
|done
 
|-
 
| 3/22
 
| Day
 
|
 
* Optics (Liyanage) Sieve OUT.  NB Current limit 2 uA!
 
|done
 
|-
 
| 3/22
 
| Swing
 
|
 
* Optics continued, sieve IN.  NB Current limit 2 uA! (Shift Crew)
 
|done
 
|-
 
| 3/23
 
| Owl
 
|
 
* Quartz detectors resolution studies (KK, Dustin, John W)
 
* Lumi studies (Luis)
 
|done
 
|-
 
| 3/23
 
| Day
 
|
 
* Remove water target. (Target, Techs)
 
* Reconfigure Moller cryo.
 
* '''Beam studies''' ~ 2pm, study of helicity correlated position differences for spin flipper states. (Dalton, Rupesh, Reza)
 
|water cell removed, rest not finished
 
|-
 
| 3/23
 
| Swing
 
|
 
* Target pumpdown
 
|done
 
|-
 
| 3/24
 
| Owl
 
|
 
* Target pumpdown
 
|done
 
|-
 
| 3/24
 
| Day
 
|
 
* Target cooldown
 
|done
 
|-
 
| 3/24
 
| Swing
 
|
 
* Tune high current beam into Hall A
 
|done
 
|-
 
| 3/25
 
| Owl
 
|
 
* Commission lead target, 50 uA (Bob)
 
* Lumis and oversampling tests (KK, Luis, Paul)
 
|in progress
 
|-
 
| 3/25
 
| Day
 
|
 
* Access to fix left dipole
 
|done
 
|-
 
| 3/25
 
| Swing
 
|
 
* Parity Quality commissioning (Kent, Rupesh, Luis, Dustin)
 
* Beam monitor calibrations (Diancheng Wang, Xiaoyan Deng)
 
|postponed
 
|-
 
| 3/26
 
| Owl
 
|
 
* High Luminosity Detector Commissioning
 
|in progress
 
|-
 
| 3/26
 
| Day
 
|
 
*Moller Checkout
 
|postponed
 
|-
 
| 3/26
 
| Swing
 
|
 
*High Current on C12 (thick and thin)
 
|partly done
 
|-
 
| 3/27
 
| Owl
 
|
 
| no beam
 
|-
 
| 3/27
 
| Day
 
|
 
| no beam
 
|-
 
| 3/27
 
| Swing
 
|
 
*High-current on thick C12, adjust HV (Luis or Bob)
 
*Finish the commissioning of thick Pb target (Bob, Ahmed)
 
*Electronic Commissioning (KK, Luis, Paul, Jon et al)
 
|done, high-current tests continue
 
|-
 
| 3/28
 
| Owl
 
|
 
*Continue with the above, if necessary.
 
*High Luminosity Commissioning (Rupesh, Luis, Jon, Bob)
 
*BCM/BPM calibration (Rupesh)
 
*Establishing Parity Measurements, Charge feedback, blinding (Rupesh, Jon)
 
|not finished
 
|-
 
| 3/28
 
| Day
 
|
 
*Comparison Study of Optics Tunes (Seamus, Nilanga, Kiad)
 
*Sometime before Monday, submit the ATLIS plan for Dithering test (Rupesh)
 
|done
 
|-
 
| 3/28
 
| Swing
 
|
 
*Continue Optics if necessary.
 
*Continue High Luminosity Commissioning
 
|done
 
|-
 
| 3/29
 
| Owl
 
|
 
*Mini-production run (shift crew)
 
*Stop beam at 07:00 or whenever Ed Folts asks to.
 
|done
 
|-
 
| 3/29
 
| Day
 
|
 
*Open Hall A to set up Moller and Compton (Ed Folts, Sasha, Sirish, et.al.)
 
*Work on GEMs (Alex, Seamus, et.al.)
 
*MCC to do beam studies while Hall A open
 
*Detector linearity/LED tests (Luis)
 
*Setup WAC analysis (Mark, Mindy)
 
|done
 
|-
 
| 3/29
 
| Swing
 
|
 
*Moller magnet cooldown
 
*Optics and acceptance studies (Seamus, Ahmed, Nilanga)
 
|done
 
|-
 
| 3/30
 
| Owl
 
|
 
*Commission charge feedback (Mark)
 
*Current monitor calibration and pedestals determination (Mark)
 
*Quasi-production on Empty Target (owl shift crew)
 
|done
 
|-
 
| 3/30
 
| Day
 
|
 
*Access do work on Moller and Compton.
 
*Some GEM installation work. (Alex, Seamus, Kiad, Nilanga)
 
*Possible linearity/LED study. (Luis)
 
|done, except linearity
 
|-
 
| 3/30
 
| Swing
 
|
 
*First Commissioning of Moller -- Beam Checks (Sasha, Javier, Roman, Jay)
 
|done
 
|-
 
| 3/31
 
| Owl
 
|
 
*Scans of Septum and quad Q1 for tunes A and B. (Bob)
 
*Beam Studies of Helicity Correlations
 
|done
 
|-
 
| 3/31
 
| Day
 
|
 
*Beam Tuning (Jay Benesch)
 
|done
 
|-
 
| 3/31
 
| Swing
 
|
 
*Either or both of these:
 
* a) Moller Commissioning (Sasha, Javier, Roman, Jay)
 
* b) Tests of Dithering and other Beam-Related things (Kent, Rupesh)
 
|Moller was done
 
|-
 
| 4/1
 
| Owl
 
|
 
*If Kent's tests not done on Swing, continue here. (Kent, Rupesh)
 
*Beam and Septum scan with new tune (Seamus)
 
*Helicity-correlated beam studies (Shift crew)
 
|done
 
|-
 
| 4/1
 
| Day
 
|
 
* Beam Tuning (Jay)
 
|done, successful
 
|-
 
| 4/1
 
| Swing
 
|
 
* More beam tuning if necessary
 
* Moller Commissioning
 
|done
 
|-
 
| Friday 2 April
 
| Owl
 
|
 
*Assuming the HRS tune has been frozen
 
*Check detector alignment
 
*A_T studies
 
*Q<sup>2</sup> Measurements
 
|partly done, needs more work
 
|-
 
| Friday 2 April
 
| Day
 
|
 
*Tuning Beam for Compton
 
|done
 
|-
 
| Friday 2 April
 
| Swing
 
|
 
*  20:00 Obtain sieve runs (optics mini-run plan), Q<sup>2</sup> measurements (Bob)
 
|done, but not Q<sup>2</sup>
 
|-
 
| Saturday 3 April
 
| Owl
 
|
 
* Obtain sieve runs on Ta (Nilanga mini-run plan)
 
* Put in Lead target at low current and do counting-mode runs (Rupesh, Ahmed)
 
* Integrate-mode with Lead at 2 or 3 uA (Luis, Jon)
 
|done
 
|-
 
| Saturday 3 April
 
| Day
 
|
 
* Moller Commissioning <font color="green">(priority activity)</font>
 
* Work on getting into production mode (Mark, Rupesh)
 
|done, but not yet in prod.
 
|-
 
| Saturday 3 April
 
| Swing
 
|
 
* Moller commissioning
 
|done
 
|-
 
| Sunday 4 April
 
| Owl
 
|
 
* Counting data on tune Y (right arm) super-thin carbon
 
* Change to tune B
 
* Integrate-mode with Lead at 2 or 3 uA (Luis, Jon)
 
|done
 
|-
 
| Sunday 4 April
 
| Day
 
|
 
* Integrate-mode with thick carbon 50 uA
 
* Compton QWP1 calibration.
 
|done
 
|-
 
| Sunday 4 April
 
| Swing
 
|
 
* General Compton commissioning and pseudo-production (empty target) parity data at 50 uA.
 
|done
 
|-
 
| Monday 5 April
 
| Owl
 
|
 
* pseudo-production (empty target) parity data and Compton data at 50 uA.
 
|done
 
|-
 
| Monday 5 April
 
| Day
 
|
 
* 12:00 Jay to run optics test (~ 30 mins)
 
* Moller Spin Dance
 
* Set up vertical polarization and measure A_T
 
|done
 
|-
 
| Monday 5 April
 
| Swing
 
|
 
*Continue to setup up vertical polarization
 
*Measurements of A_T on Pb and C12
 
|done
 
|-
 
| Tuesday 6 April
 
| Owl
 
|
 
* Continue measurements of A_T on Pb and C12
 
|partly done
 
|-
 
| Tuesday 6 April
 
| Day
 
|
 
* Possible horizontal scan:  Tune B with sieve slit (Seamus)
 
* When ready: Relocate Quartz Detectors (Dustin, Jack)
 
|postponed: vacuum problems
 
|-
 
| Tuesday 6 April
 
| Swing
 
|
 
* In restricted access.
 
* Any activities that require access.
 
* Shift canceled
 
|
 
|-
 
| Wednesday 7 April
 
| Owl
 
|
 
* Shift cancelled
 
|
 
|-
 
| Wednesday 7 April
 
| Day
 
|
 
*Shift cancelled
 
* Investigate target vacuum problem
 
* Move quartz detectors (Dustin, Jack)
 
|Leak found at O-ring connection between target chamber and collimator box
 
|-
 
| Wednesday 7 April
 
| Swing
 
|
 
*Shift cancelled
 
|
 
|-
 
| Thursday 8 April
 
| Owl
 
|
 
*Shift cancelled
 
|
 
|-
 
| Thursday 8 April
 
| Day
 
|
 
*Shift cancelled
 
|Target chamber open, found that the 4th foil in Optics target blown off
 
|-
 
| Thursday 8 April
 
| Swing
 
|
 
*Shift cancelled
 
|
 
|-
 
| Friday 9 April
 
| Owl
 
|
 
*Shift cancelled
 
|
 
|-
 
| Friday 9 April
 
| Day
 
|
 
* To be determined.
 
* When ready: Install GEMs
 
|
 
|-
 
| Friday 9 April
 
| Swing
 
|
 
* Cancelled
 
|
 
|-
 
| Saturday 10 April
 
| Owl
 
|
 
* Cancelled
 
|
 
|-
 
| Saturday 10 April
 
| Day
 
|
 
* Cancelled
 
|
 
|-
 
| Saturday 10 April
 
| Swing
 
|
 
* Cancelled
 
|
 
|-
 
| Sunday 11 April
 
| Owl
 
|
 
* Cancelled
 
|
 
|-
 
| Sunday 11 April
 
| Day
 
|
 
* Cancelled
 
|
 
|-
 
| Sunday 11 April
 
| Swing
 
|
 
* Cancelled
 
|
 
|-
 
| Monday 12 April
 
| Owl
 
|
 
* Cancelled
 
|
 
|-
 
| Monday 12 April
 
| Day
 
|
 
* Cancelled
 
|
 
|-
 
| Monday 12 April
 
| Swing
 
|
 
* Cancelled
 
|
 
|-
 
| Tuesday 13 April
 
| Owl
 
|
 
* Cancelled
 
|
 
|-
 
| Tuesday 13 April
 
| Day
 
|
 
* Cancelled
 
|
 
|-
 
| Tuesday 13 April
 
| Swing
 
|
 
* Cancelled
 
|Tungsten collimator modified and installed.  Target pump down started and initially successful.
 
|-
 
| Wednesday 14 April
 
| Owl
 
|
 
* Cancelled
 
| Target pump down.
 
|-
 
| Wednesday 14 April
 
| Day
 
|
 
* Cancelled -- no shift workers (might need a TO)
 
* Target pump down and leak checking.
 
* When ready, begin target cooldown. (Dave Meekins and JP)
 
| Done.  Vacuum good.  Target cold.
 
|-
 
| Wednesday 14 April
 
| Swing
 
|
 
* Beam restore in Hall A
 
* Harp Scan - Shifters
 
* Raster size scan (goal is 3x3mm on empty cell) - Shifters.
 
* Detector Alignment - Dustin
 
* Dithering run with Septum On/Off - Rupesh.
 
|
 
|-
 
| Thursday 15 April
 
| Owl
 
|
 
<!--#* Beam restore in Hall A
 
#* When ready, begin <font color="blue">PREX recovery program:</font>
 
#* Check alignment of collimator.  Check temperature vs beam current. (Bob)
 
#* Check alignment of PREX quartz detector. (Dustin)
 
#* Check alignment of sieve slits, verify they did not change. (Seamus or Bob)
 
* Check alignment of Pb/diamond target and optimal raster size. (Bob)-->
 
* Thick Carbon Integrating Mode Run - Rupesh.
 
* Thick Carbon Dithering Run - Rupesh + Luis.
 
* Take Access: Change to counting mode and put sieve in - Ahmed.
 
|
 
|-
 
| Thursday 15 April
 
| Day
 
|
 
* Beam Studies -- establishing good beam in Hall A and Compton (Jay and B team)
 
|
 
|-
 
| Thursday 15 April
 
| Swing
 
|
 
* Detector Alignment - Dustin.
 
* Pb Alignment - Bob.
 
* Take access and put sieve in - Seamus.
 
* Sieve Alignment - Seamus.
 
* Take Access to remove sieve (Seamus) + switch to integrating mode (Jon) - '''Page Guy and Bob'''.
 
* Heat load test '''(run up to 500C)''' - Bob + Guy.
 
If possible, depending on heat load test:
 
* Relative Rate 12C/Pb Runs - Bob / Dustin.
 
* Start production (Rupesh, Luis, Kent, Krishna)
 
|
 
|-
 
| Friday 16 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Friday 16 April
 
| Day
 
|
 
* Production
 
|
 
|-
 
| Friday 16 April
 
| Swing
 
|
 
* Production @ 40uA
 
* Ramp up to 50uA (Guy + Bob)
 
|
 
|-
 
| Saturday 17 April
 
| Owl
 
|
 
* Production @ 50uA
 
|
 
|-
 
| Saturday 17 April
 
| Day
 
|
 
* Production @ 50uA
 
* Moller Checks + Measurement Starting 9am (Sasha)
 
|
 
|-
 
| Saturday 17 April
 
| Swing
 
|
 
* Moller till 7pm (Sasha).
 
* Compton (Jay Benesch + Megan).
 
* Production @ 50uA.
 
|
 
|-
 
| Sunday 18 April
 
| Owl
 
|
 
* Production @ 50uA
 
|
 
|-
 
| Sunday 18 April
 
| Day + Swing
 
|
 
* Production @ 50uA.
 
* Staring 3pm:
 
# Compton test (Jay Benesch + Megan).
 
# Page Dustin + Jon + Bob + Sasha.
 
# Q^2 Measurement (Bob)
 
# Call Compton Experts
 
# Access:
 
## Refill Moller Magnet.
 
## Check Compton HV.
 
## Remove S0.
 
## Go to counting mode (Dustin).
 
## Compton Stuff.
 
## Detector Mapping (Jon).
 
# Detector Alignment (Dustin).
 
# Q^2 Measurement (Bob).
 
# Relative Rate Measurement (Bob).
 
# Access to Return to Integrating Mode.
 
* Production @ 50uA
 
|-
 
| Monday 19 April
 
| Owl
 
|
 
* Production @ 50uA
 
|
 
|-
 
| Monday 19 April
 
| Day
 
|
 
* Production @ 50uA
 
|
 
|-
 
| Monday 19 April
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Tuesday 20 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Tuesday 20 April
 
| Day
 
|
 
* Production
 
* Beam studies from approx. 11 am to 2 pm
 
* Hall A Activities:
 
* -- Compton 1/4wave stepper (Abdurahim)
 
* -- Check R-HRS Q2 and switch to remote mode (Heidi)
 
* -- Adjust R-HRS A_T (Dustin)
 
* -- Take pedestal data (Jon)
 
* -- Check 4th GEM and possibly install 5th (Alex, Jon)
 
* -- Test motion of A_T detector R-HRS (Jon)
 
* -- Possible Compton shielding / HV check (Megan)
 
* -- Ramp Moller magnet, measure stray fields. (Sasha)
 
* -- Parasitic work on floor (Yi Qiang)
 
|
 
|-
 
| Tuesday 20 April
 
| Swing
 
|
 
* Tune up Compton
 
* Production
 
|
 
|-
 
 
 
| Wednesday 21 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Wednesday 21 April
 
| Day
 
|
 
* Production
 
|
 
|-
 
| Wednesday 21 April
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Thursday 22 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Thursday 22 April
 
| Day
 
|
 
* Beam studies.  Transverse Phase Space Study in Wien.  (Reza, Mark, Rupesh)
 
* At ~2 pm start Moller commissioning
 
|
 
|-
 
| Thursday 22 April
 
| Swing
 
|
 
* Finish Moller (10 hours)
 
* Resume Production
 
* Don't forget the beam recovery procedure
 
|
 
|-
 
| Friday 23 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Friday 23 April
 
| Day
 
|
 
* Q<sup>2</sup> Studies (3 hrs) -- Dustin, Bob
 
* GEM studies are only parasitic.
 
|
 
|-
 
| Friday 23 April
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Saturday 24 April
 
| Owl
 
|
 
* Production on thick C12
 
|
 
|-
 
| Saturday 24 April
 
| Day
 
|
 
* Production on thick C12
 
* At about 2 pm switch to 120 Hz, still C12
 
* Run briefly on C12 at 120 Hz
 
* Switch to thick Pb target (120 Hz)
 
|
 
|-
 
| Saturday 24 April
 
| Swing
 
|
 
* Production on Pb at 120 Hz
 
|
 
|-
 
| Sunday 25 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Sunday 25 April
 
| Day
 
|
 
* Q<sup>2</sup> measurements - Bob, Dustin
 
* Otherwise production
 
|done
 
|-
 
| Sunday 25 April
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Monday 26 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Monday 26 April
 
| Day
 
|
 
* Wien flip
 
|Wien flip postponed until Tues
 
|-
 
| Monday 26 April
 
| Swing
 
|
 
* Production
 
|-
 
| Tuesday 27 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Tuesday 27 April
 
| Day
 
|
 
* Beam Studies
 
* Wien Flip
 
* Checks of laser at polarized source (Kent and EGG)
 
* Adiabatic Damping Study (Yves Roblin)
 
|
 
Done
 
|-
 
| Tuesday 27 April
 
| Swing
 
|
 
* Compton Tune
 
* 4 hrs on Thick Carbon (RD=0, IT=500us)
 
* flip half-wave plate
 
* 4 hrs on Thick Carbon
 
|
 
|-
 
| Wednesday 28 April
 
| Owl
 
|
 
* Finish Swing Plan
 
* Yves Roblin Measurement (if possible)
 
* Run on Carbon (RD=0, IT=1535)
 
|
 
|-
 
| Wednesday 28 April
 
| Day
 
|
 
* Moller
 
|
 
|-
 
| Wednesday 28 April
 
| Swing
 
|
 
* Finish Moller
 
* Production
 
|
 
|-
 
| Thursday 29 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Thursday 29 April
 
| Day
 
|
 
* Production
 
|Access to repair target leak
 
|-
 
| Thursday 29 April
 
| Swing
 
|
 
* Production
 
|Could not close hall due to faulty fire suppression system
 
|-
 
| Friday 30 April
 
| Owl
 
|
 
* Production
 
|Could not close hall due to faulty fire suppression system
 
|-
 
| Friday 30 April
 
| Day
 
|
 
* 08:00 Beam Stops for Open House
 
|
 
|-
 
| Friday 30 April
 
| Swing
 
|
 
* No Beam
 
* Injector studies
 
|
 
|-
 
| Friday 30 April
 
| Owl
 
|
 
* No Beam
 
* Injector studies
 
|
 
|-
 
| Saturday 1 May
 
| Day
 
|
 
* Open House
 
* Detector work
 
* Compton work
 
|
 
|-
 
| Saturday 1 May
 
| Swing
 
|
 
* Restore Beam. 
 
* Check Beam Properties.  (shift)
 
* Pulsed Beam Test. (Mark, Luis)
 
|
 
|-
 
| Sunday 2 May
 
| Owl
 
|
 
* Continue with Above Tests
 
* Raster and Pb Target Tests (Bob)
 
|
 
|-
 
| Sunday 2 May
 
| Day
 
|
 
* Continue Above Tests if necessary
 
* Start Production
 
* Get cavities to work at high current.  (Ahmed)
 
* (The check of cavities at low current is postponed.)
 
|
 
|-
 
| Sunday 2 May
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Monday 3 May
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Monday 3 May
 
| Day
 
|
 
* Pass change 3 -> 5 for Hall B until ~1:00PM
 
* Compton vacuum, LHRS dipole UPS replacement during the down
 
* Return to PbD #2 production
 
|
 
|-
 
| Monday 3 May
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Tuesday 4 May
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Tuesday 4 May
 
| Day
 
|
 
* Beam studies
 
* Installation of new switch for Pockels cell (as per Kent)
 
* 8 hour Compton beam line bake-out, leak check
 
|
 
|-
 
| Tuesday 4 May
 
| Swing
 
|
 
* Production
 
|
 
|-
 
|}
 