Line 1: Line 1:
<span style="color:red">In the process of editing and updating this page. Please contact Juliette Mammei <B>[mailto:crowder@jlab.org?Subject=PREXwiki crowder@jlab.org]</B> with questions or suggestions.</span>
+
 
 
<br><br>
 
<br><br>
[https://prex.jlab.org/wiki/index.php/Main_Page <B>PREX Main</B>] << [[Run Coordinator Tools]] <br><br>
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
  
== Daily Run Plan ==
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
  
Here are details of the daily run plan.  See also the [https://prex.jlab.org/wiki/index.php?title=RunPlan Global Run Plan].  The person responsible should ensure that
+
== Current Daily Run Plans ==
a crew of experts is available for the shift.  This schedule will be updated frequently by the Run Coordinator
 
as the situation on the ground changes. 
 
  
Previous daily run plans can be found here [[PreviousRunPlanDaily]]
+
The current day is indicated by a color.
<hr>
 
  
{| border="1"
+
{| class="wikitable" border="1" style="width:100%; text-align:left;border-collapse:collapse"
|+ Daily Run Plan for PREX &nbsp; <font color="blue">(latest at bottom)</font>
+
|-  
! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!---&nbsp;Status&nbsp;---
+
! style="width:10%"| Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
|-
 
| Monday 7 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Monday 7 June
 
| Day
 
|
 
* Moller Measurement (noon to 4pm)
 
* Big Change asymmetry run
 
* Production
 
|
 
|-
 
| Monday 7 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Tuesday 8 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Tuesday 8 June
 
| Day
 
|
 
* Production
 
* Wien Flip (9 AM)
 
* Beam study (9-11 AM)
 
|
 
|-
 
| Tuesday 8 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Wednesday 9 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Wednesday 9 June
 
| Day
 
|
 
* Production
 
|
 
|-
 
| Wednesday 9 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Thursday 10 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Thursday 10 June
 
| Day
 
|
 
* Production
 
|
 
|-
 
| Thursday 10 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Friday 11 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Friday 11 June
 
| Day
 
|
 
* Production
 
* Wien flip
 
|
 
|-
 
| Friday 11 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Saturday 12 June
 
| Owl
 
|
 
* High Statistics Lead Inelastics, Qsq|GEM test, Calibration of the cavities with the amplifier
 
| all done
 
|-
 
| Saturday 12 June
 
| Day
 
|
 
* Backgrounds: Dipole Scan, Transverse Polarization Measurements.
 
| Finished left dipole scan, right dipole scan is pending
 
|-
 
| Saturday 12 June
 
| Swing
 
|
 
* Transverse Polarization Measurements. Carbon
 
|
 
|-
 
| Sunday 13 June
 
| Owl
 
|
 
* Transverse Polarization Measurements. Lead
 
|
 
|-
 
| Sunday 13 June
 
| Day
 
|
 
* Transverse Polarization Measurements. Lead
 
4494 32k (beam current stepping up, might not be good)
 
4495 78k
 
4496 73k
 
4497
 
| Already took 580K multiplets, 60K of them may not be good data
 
|-
 
| Sunday 13 June
 
| Swing
 
|
 
  
* If right Q2 fixed, take 100K more A_T data then go back to production. Otherwise go back to single arm production
 
|
 
|-
 
| Monday 14 June
 
| Owl
 
|
 
* Continue Transverse Polarization Measurements. Blinded tube test
 
|
 
|-
 
| Monday 14 June
 
| Day
 
|
 
* Production
 
|
 
Remaining [https://prex.jlab.org/wiki/index.php/User_talk:Jixie_Zhang auxiliary measurements]
 
* PREx det. current calibrations (Monday swing)
 
* Finish dipole scan (Tuesday owl)
 
* Oversampling by 2 at 120 Hz (put off/cancelled)
 
* Beam induced linearity studies (put off/cancelled)
 
* Q2 measurements (relative using T5 during dipole scan)
 
* MOLLER commissioning (if can't do anything else - need repair? - see Jixie or Roman)
 
|-
 
| Monday 14 June
 
| Swing
 
|
 
* Production
 
* PREx det. current calibrations (Partially done)
 
|
 
* large charge asymmetry run couldn't be done b/c MCC couldn't set RHWP to 2500 (see [http://www.jlab.org/~adaq/halog/html/1006_archive/100614223155.html Rupesh' log entry])
 
|-
 
| Tuesday 15 June
 
| Owl
 
|
 
* Production
 
* Finish dipole scan (Done)
 
|
 
* Modified dipole scan completed overnight (see Bob's entries [http://www.jlab.org/~adaq/halog/html/1006_archive/100615031427.html 1] and [http://www.jlab.org/~adaq/halog/html/1006_archive/100615050141.html 2])
 
|-
 
| Tuesday 15 June
 
| Day
 
|
 
* Beam Studies  <br>
 
expected to deliver beam to Hall A - '''NO AUTOMATIC ACCESS'''
 
* Production
 
|
 
* large charge asymmetry run taken (see [http://www.jlab.org/~adaq/halog/html/1006_archive/100615093424.html run 4574])
 
* Beam was lost during beam studies after all
 
** Megan and Alex went in to check on the Compton
 
** Jixie and Roman did some work on the Moller, including a refill
 
** Jack and Howard worked on the RHRS dipole which had issues
 
|-
 
| Tuesday 15 June
 
| Swing
 
|
 
* Production
 
|
 
 
|-
 
|-
| Wednesday 16 June
+
| rowspan="3" | Wedsday, September 4
 
| Owl
 
| Owl
 +
| Production 71uA
 
|
 
|
* Production
 
|
 
* went to single arm running after right dipole power supply trip
 
 
|-
 
|-
| Wednesday 16 June
 
 
| Day
 
| Day
|
+
| Moller
* Right arm dipole repairs
+
|  
* Put silicone on target
 
* Production
 
|
 
* Dipole issues unresolved
 
* Silicone helps target [http://www.jlab.org/~adaq/halog/html/1006_archive/100616154402.html vacuum pressure]
 
 
|-
 
|-
| Wednesday 16 June
 
 
| Swing
 
| Swing
 +
| Moller
 
|
 
|
* Begin with PbD#3 - check temperatures
 
** If too high - switch back to PbD#1
 
* Production - single arm running
 
|
 
* Beam not back until ~11pm
 
* Try to do beam recovery before owl starts
 
 
|-
 
|-
| Thursday 17 June
+
| rowspan="3" | Thursday, September 5
 
| Owl
 
| Owl
|
+
| Production 71uA
* Production (single arm)
 
 
|
 
|
 
|-
 
|-
| Thursday 17 June
 
 
| Day
 
| Day
|
+
| Mott polarimetry measurements
* Right dipole repairs
+
|  
* Wien Flip (10am)
 
|
 
* Wien Flip done this morning
 
* Right dipole working for now
 
* Target warm up flashed off N2 ice - target cooling down
 
 
|-
 
|-
| Thursday 17 June
 
 
| Swing
 
| Swing
 +
| Production 71uA
 
|
 
|
* Trouble sending 70 uA beam
 
|
 
* BCMs needed calibration
 
 
|-
 
|-
| Friday 18 June
+
| rowspan="3" | Friday, September 6
 
| Owl
 
| Owl
 +
| Production 71uA
 
|
 
|
* Production
 
|
 
* 70 uA beam transport established
 
* Problem with RHRS rates discovered (25x smaller than LHRS)
 
 
|-
 
|-
| Friday 18 June
 
 
| Day
 
| Day
|
+
| Production 85uA
* Production
+
|  
* End of Run Party 2-4pm in the ResFac Great Room
 
|
 
* RHRS sieve discovered to be partially in; Howard went in and moved it out
 
 
|-
 
|-
| Friday 18 June
 
 
| Swing
 
| Swing
|
+
| Production 85uA
* Production
 
 
|
 
|
 
|-
 
|-
| Saturday 19 June
+
| rowspan="3" | Saturday, September 7
 
| Owl
 
| Owl
|
+
| Production 85uA
* Production
 
 
|
 
|
 
|-
 
|-
| Saturday 19 June
 
 
| Day
 
| Day
|
+
| Production 85uA
* Production
+
|  
|
 
 
|-
 
|-
| Saturday 19 June
 
 
| Swing
 
| Swing
|
+
| Production 85uA
* Production
 
 
|
 
|
 
|-
 
|-
| Sunday 20 June
+
|-style="background: #FCF3CF;
 +
| rowspan="3" | Sunday, September 8
 
| Owl
 
| Owl
|
+
| Production 85uA
* Production
 
 
|
 
|
 
|-
 
|-
| Sunday 20 June
 
 
| Day
 
| Day
|
+
| Moller Polarimetry
* Production
+
|  
|
 
 
|-
 
|-
| Sunday 20 June
 
 
| Swing
 
| Swing
|
+
| Q2 measurement and Spectrometer rescattering
* Production
+
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
|
 
 
|-
 
|-
| Monday 21 June
+
| rowspan="3" | Monday, September 9
 
| Owl
 
| Owl
|
+
| Production 85uA
* Production
 
 
|
 
|
 
|-
 
|-
| Monday 21 June
 
 
| Day
 
| Day
|
+
| SADness
* Dismantle detectors - see Dustin or Alex
+
| Scheduled Accelerator Down begins
|
 
|-
 
| Tuesday 21 June
 
| Day
 
|
 
* Counting house cleaning party beginning at 8am!
 
|
 
 
|}
 
|}
 +
[[Run plan history | <B>Previous Daily Run Plans</B>]]
 +
 +
== Instructions for RC ==
 +
 +
* Let the day shift know what to do while you attend the MCC meeting
 +
* Copy the daily run plans for the previous week to the [[Run plan history]]
 +
* Copy the [[Run Plan Template]] table to this page and change the dates
 +
* Update the plan above (if necessary) after the MCC meeting
 +
 +
[[Category:HOW TO]] [[Category:SL]] [[Category:RC]]
 +
 +
<hr>

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting