== Beamline instrumentation calibration ==
 
== Beamline instrumentation calibration ==
 
# <font color="blue">Basic setup</font>
 
#* No target.
 
#* 50uA beam current, through Compton (backgrounds on fingers and Compton photon detector).
 
# <font color="blue">High current with target</font>
 
## Establish 4x4 raster. Insert lead target.
 
## Detector and SAM voltages (Dustin M)
 
# <font color="blue">Beamline instrumentation calibration</font>
 
## Current ramp for BPM/BCM calibrations and detector pedestals
 
# <font color="blue"> Initial production condition test</font>
 
## detector and SAM widths
 
## regression sensitivities
 
## beam noise and asymmetry check
 
## collimator water and thermocouple temperatures,
 
## radiation monitors and ion chamber stability
 
# <font color="blue"> Width studies  </font>  <span style="background-color:#F1C40F">0.5 shift</span> KK,
 
## detector and SAM widths, targets, shutters, etc
 
## deinstall shutters at conclusion of test
 
 
  
 
# <font color="blue"> Check the following has been performed</font>  
 
# <font color="blue"> Check the following has been performed</font>  
 
#* 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector) with no target  
 
#* 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector) with no target  
#* Establish 4x4 raster. Insert lead target.  
+
#* Establish 4x4 raster. Insert lead target. (low current, ramp up. check collimator water, vary raster size 4x6?)
#* Set Detector and SAM voltages (Dustin M)
+
#* Set Detector and SAM voltages (Dustin M)  
 
 
 
#<font color="blue"> Check Conditions OK</font>  
 
#<font color="blue"> Check Conditions OK</font>  
 
#*collimator water
 
#*collimator water
Line 30: Line 11:
 
#*radiation monitors
 
#*radiation monitors
 
#*ion chamber stability
 
#*ion chamber stability
 
 
# <font color="blue"> Setup Locks (these are necessary for main detectors and SAM calibration)</font>  
 
# <font color="blue"> Setup Locks (these are necessary for main detectors and SAM calibration)</font>  
 
#*Slow Target Lock on 4A, 4E (jmenu->"slow locks"-> Orbit Locks Expanded View -> HallATGT)
 
#*Slow Target Lock on 4A, 4E (jmenu->"slow locks"-> Orbit Locks Expanded View -> HallATGT)
Line 36: Line 16:
 
#* If beam is going through Compton, HallAComLock should probably be on
 
#* If beam is going through Compton, HallAComLock should probably be on
 
#* Should HallAMolLock be on?
 
#* Should HallAMolLock be on?
 
 
#<font color="blue">Coordinate</font>  
 
#<font color="blue">Coordinate</font>  
 
#* Should Compton and Moller DAQ be running during calibration?
 
#* Should Compton and Moller DAQ be running during calibration?
 
#* Dustin and Devi examining SAMs and Detectors with online analyzer during calibration
 
#* Dustin and Devi examining SAMs and Detectors with online analyzer during calibration
 
#* Juan Carlos/Amali/Adam monitor Compton background rates and run the DAQ?
 
#* Juan Carlos/Amali/Adam monitor Compton background rates and run the DAQ?
 
+
#* Ye puts Cavity BPMs in high current mode (opsl01 -> menubar->EDM->BPM->BPM Diagnostics DR(12GeV)->HallA BCMs B,C,D -> button -> Expert Controls -> HWReg button -> DACSL1 = 0x1 / 0x1  and DACSL2 = 0x1 / 0x1 -> back out to previous screen XVGA2 = 0 and YVGA2 =0 (for low current do 0x0 and VGA2=30). Do for all 3 BPM Cavs.
 
# <font color="blue"> Calibration Procedure A: with UNSER</font>  
 
# <font color="blue"> Calibration Procedure A: with UNSER</font>  
 
#*start at 70uA for 1min (scandata1==value in BCM0l02)
 
#*start at 70uA for 1min (scandata1==value in BCM0l02)
Line 52: Line 31:
 
#*wait for 5sec(for unser to equilibrate), take next data point for 1min  
 
#*wait for 5sec(for unser to equilibrate), take next data point for 1min  
 
#*repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA  
 
#*repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA  
 
 
# <font color="blue"> Calibration Procedure B: with pre-calibrated Hall BCM (analog upstream bcm)</font>  
 
# <font color="blue"> Calibration Procedure B: with pre-calibrated Hall BCM (analog upstream bcm)</font>  
 
#*start at 70uA for 1min (scandata1==value in BCM0l02)
 
#*start at 70uA for 1min (scandata1==value in BCM0l02)
#change current to 75uA
+
#*change current to 75uA
 
#*check slow target lock is in position
 
#*check slow target lock is in position
 
#*check FFB on for HallA
 
#*check FFB on for HallA
Line 61: Line 39:
 
#*take next 1min data point
 
#*take next 1min data point
 
#*repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA  
 
#*repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA  
 
 
# <font color="blue"> Calibration Procedure C: for BPMs (Compton bpms not yet calibrated)</font>  
 
# <font color="blue"> Calibration Procedure C: for BPMs (Compton bpms not yet calibrated)</font>  
 
#*at 70uA, set gains off for iocse9,iocse10 (Hall) iocse11,iocse12,iocse19,iocinse4 (Inj)
 
#*at 70uA, set gains off for iocse9,iocse10 (Hall) iocse11,iocse12,iocse19,iocinse4 (Inj)
#*rperform Calibration Procedure B with pre-calibrated Hall BCM  
+
#*perform Calibration Procedure B with pre-calibrated Hall BCM
 
 
# <font color="blue">Beamline instrumentation calibration</font> <span style="background-color:#F1C40F">0.5 shift</span> Caryn P,
 
## Current ramp for BPM/BCM calibrations and detector pedestals [[detailed Calibration plan|detailed plan]]
 
# <font color="blue"> Initial production condition test</font>  <span style="background-color:#F1C40F">0.25 shift</span> Caryn P,
 
## detector and SAM widths
 
## regression sensitivities
 
## beam noise and asymmetry check
 
## collimator water and thermocouple temperatures,
 
## radiation monitors and ion chamber stability
 
# <font color="blue"> Width studies  </font>  <span style="background-color:#F1C40F">0.5 shift</span> KK,
 
## detector and SAM widths, targets, shutters, etc
 
## deinstall shutters at conclusion of test
 

Latest revision as of 13:18, 8 December 2019

CREX version

Beamline instrumentation calibration

  1. Check the following has been performed
    • 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector) with no target
    • Establish 4x4 raster. Insert lead target. (low current, ramp up. check collimator water, vary raster size 4x6?)
    • Set Detector and SAM voltages (Dustin M)
  2. Check Conditions OK
    • collimator water
    • thermocouple temperatures
    • radiation monitors
    • ion chamber stability
  3. Setup Locks (these are necessary for main detectors and SAM calibration)
    • Slow Target Lock on 4A, 4E (jmenu->"slow locks"-> Orbit Locks Expanded View -> HallATGT)
    • Fast feedback for HallA on (iocse9)
    • If beam is going through Compton, HallAComLock should probably be on
    • Should HallAMolLock be on?
  4. Coordinate
    • Should Compton and Moller DAQ be running during calibration?
    • Dustin and Devi examining SAMs and Detectors with online analyzer during calibration
    • Juan Carlos/Amali/Adam monitor Compton background rates and run the DAQ?
    • Ye puts Cavity BPMs in high current mode (opsl01 -> menubar->EDM->BPM->BPM Diagnostics DR(12GeV)->HallA BCMs B,C,D -> button -> Expert Controls -> HWReg button -> DACSL1 = 0x1 / 0x1 and DACSL2 = 0x1 / 0x1 -> back out to previous screen XVGA2 = 0 and YVGA2 =0 (for low current do 0x0 and VGA2=30). Do for all 3 BPM Cavs.
  5. Calibration Procedure A: with UNSER
    • start at 70uA for 1min (scandata1==value in BCM0l02)
    • beam off
    • wait for 5sec(for unser to equilibrate), take unser pedestal data point for 30sec (scandata1=0)
    • beam on at 75uA
    • check slow target lock is in position
    • check FFB on for HallA
    • check no bpms are saturated on iocse9
    • wait for 5sec(for unser to equilibrate), take next data point for 1min
    • repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA
  6. Calibration Procedure B: with pre-calibrated Hall BCM (analog upstream bcm)
    • start at 70uA for 1min (scandata1==value in BCM0l02)
    • change current to 75uA
    • check slow target lock is in position
    • check FFB on for HallA
    • check no bpms are saturated on iocse9
    • take next 1min data point
    • repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA
  7. Calibration Procedure C: for BPMs (Compton bpms not yet calibrated)
    • at 70uA, set gains off for iocse9,iocse10 (Hall) iocse11,iocse12,iocse19,iocinse4 (Inj)
    • perform Calibration Procedure B with pre-calibrated Hall BCM