Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
m
 
(302 intermediate revisions by 14 users not shown)
Line 1: Line 1:
<span style="color:red">In the process of editing and updating this page. Please contact Juliette Mammei <B>[mailto:crowder@jlab.org?Subject=PREXwiki crowder@jlab.org]</B> with questions or suggestions.</span>
+
 
 
<br><br>
 
<br><br>
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br>
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
  
[[PREX2RunPlan2019 | Global Run Plan]]
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
  
 
== Current Daily Run Plans ==
 
== Current Daily Run Plans ==
Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
|-  
+
 
| rowspan="3" | Monday, June 17
+
|-
| Owl  
+
| rowspan="3" | Wedsday, September 4
 +
| Owl
 +
| Production 71uA
 
|
 
|
|
 
|-
 
| Day
 
| Last day for planned collaboration work in Hall.
 
| Expecting 2A alignment
 
|-
 
| Swing 
 
| Vacuum connections between US pipe and target and between target and collimator box.
 
|
 
 
|-
 
|-
| rowspan="3" | Tuesday, June 18
+
| Day
| Owl
+
| Moller
|  
 
 
|  
 
|  
 
|-
 
|-
| Day
+
| Swing
|  
+
| Moller
| Pump down the entire pivot to dump region; Expecting 2B alignment
+
|
 
|-
 
|-
| Swing
+
| rowspan="3" | Thursday, September 5
|  
+
| Owl
| Target software checks
+
| Production 71uA
 +
|
 
|-
 
|-
| rowspan="3" | Wednesday, June 19
+
| Day
| Owl
+
| Mott polarimetry measurements
 
|  
 
|  
|
 
|-
 
| Day ||
 
|  Hall Closed. Final Checklist. Possible first beam in Hall A
 
 
|-
 
|-
| Swing  
+
| Swing
| Continue beam in Hall A for tuning. Start low beam checkout.
+
| Production 71uA
 
|
 
|
 
|-
 
|-
| rowspan="3" | Thursday, June 20
+
| rowspan="3" | Friday, September 6
| Owl  
+
| Owl
| Continue low beam current checkout.
+
| Production 71uA
| Completed Collimator search.
 
|-
 
| Day
 
| Tuning
 
 
|
 
|
 
|-
 
|-
| Swing
+
| Day
| Tune up and Low current commissioning.
+
| Production 85uA
 
|  
 
|  
 
|-
 
|-
| rowspan="3" | Friday, June 21
+
| Swing
| Owl
+
| Production 85uA
| Low current commissioning. Started optics
+
|
| Commissioned 45deg and 90deg targets. Calibrated ion chambers.  Bullseye scan.
 
|-
 
| Day
 
| High current + Compton rate tuning.
 
|-
 
| Swing  
 
|High current calibration after tuning (Caryn). Low current commissioning.  Restart Optics (Seamus, Sanghwa, Ryan)
 
| Basic run quality plot macro needed (Sanghwa).
 
 
|-
 
|-
| rowspan="3" | Saturday, June 22
+
| rowspan="3" | Saturday, September 7
| Owl  
+
| Owl
| Opportunistic: Beam Modulation (Paul K, Vectoria)
+
| Production 85uA
| ESR 15K helium issue, scattering chamber vacuum degration investigation
 
|-
 
| Day
 
| Optics.
 
|
 
|-
 
| Swing
 
| Low current cavity (Ye, Cip). Minimum chase.
 
|
 
|-
 
| rowspan="3" | Sunday, June 23
 
| Owl
 
| Inner edge search (Bob, Chandan, Kent). Q2 measurement with Pb target (Bob?). Opportunistic: Beam Modulation (Paul K, Vectoria)
 
| Inner edge search DONE.
 
|-
 
| Day
 
| Minimize width.
 
|
 
|-
 
| Swing
 
| Minimize width. Minimum chase.
 
 
|
 
|
|-
 
| rowspan="3" | Monday, June 24
 
| Owl
 
| Quartz align; quartz rate. (Dustin)
 
|
 
 
|-
 
|-
| Day  
+
| Day
| Optics verification.
+
| Production 85uA
| ESR 15K helium repair is ongoing.
 
|-
 
| Swing
 
 
|  
 
|  
| No beam. 
 
 
|-
 
|-
| rowspan="3" | Tuesday, June 25
+
| Swing
| Owl
+
| Production 85uA
|  
+
|
| No beam. shift cancelled.
 
 
|-
 
|-
| Day
 
| Target cooling down.
 
| shift cancelled
 
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
| Swing
+
| rowspan="3" | Sunday, September 8
| Low current cavity lock test. Optics. Opportunistic: SAM test.
+
| Owl
 +
| Production 85uA
 
|
 
|
|- style="background: #FCF3CF;
+
|-
| rowspan="3" | Wednesday, June 26
+
| Day
| Owl
+
| Moller Polarimetry
| optics
 
|
 
|-style="background: #FCF3CF;
 
| Day  
 
| Send beam through Compton chicane. Compton commissioning.
 
|
 
|-style="background: #FCF3CF;
 
| Swing
 
| optics.
 
|
 
|-
 
| rowspan="3" | Thursday, June 27
 
| Owl
 
| Q^2 on thin lead target (Bob or Kent).
 
 
|  
 
|  
 
|-
 
|-
| Day
+
| Swing
| Beam instrumentation calculation (Caryn) Production condition test (Caryn)
+
| Q2 measurement and Spectrometer rescattering
|  
+
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
 
|-
 
|-
| Swing
+
| rowspan="3" | Monday, September 9
| Width Studies (KK)
+
| Owl
 +
| Production 85uA
 
|
 
|
|-
 
| rowspan="3" | Friday, June 28
 
| Owl
 
 
|
 
 
|-
 
|-
| Day  
+
| Day
|  
+
| SADness
|  
+
| Scheduled Accelerator Down begins
|-
 
| Swing
 
|
 
|
 
 
|}
 
|}
 +
[[Run plan history | <B>Previous Daily Run Plans</B>]]
  
 
== Instructions for RC ==
 
== Instructions for RC ==

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting