<span style="color:red">In the process of editing and updating this page. Please contact Juliette Mammei <B>[mailto:crowder@jlab.org?Subject=PREXwiki crowder@jlab.org]</B> with questions or suggestions.</span>
+
 
 
<br><br>
 
<br><br>
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br>
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
  
[[PREX2RunPlan2019 | Global Run Plan]]
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
  
 
== Current Daily Run Plans ==
 
== Current Daily Run Plans ==
Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 +
 +
|-
 +
| rowspan="3" | Wedsday, September 4
 +
| Owl
 +
| Production 71uA
 +
|
 
|-
 
|-
| rowspan="3" | Tuesday, June 25
+
| Day
| Owl
+
| Moller
 
|  
 
|  
| No beam. shift cancelled.
 
 
|-
 
|-
| Day
+
| Swing
| Target cooling down.
+
| Moller
| shift cancelled
+
|
 +
|-
 +
| rowspan="3" | Thursday, September 5
 +
| Owl
 +
| Production 71uA
 +
|
 
|-
 
|-
| Swing
+
| Day
| Optics.
+
| Mott polarimetry measurements
| Vacuum issue. No beam for the whole shift.
 
|- 
 
| rowspan="3" | Wednesday, June 26
 
| Owl
 
| Optics.
 
 
|  
 
|  
 
|-
 
|-
| Day
+
| Swing
| Optics. Send beam through Compton chicane.
+
| Production 71uA
| Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened.
+
|
 +
|-
 +
| rowspan="3" | Friday, September 6
 +
| Owl
 +
| Production 71uA
 +
|
 
|-
 
|-
| Swing
+
| Day
| Low current cavity lock test. Optics.  Q^2 measurement (Bob or Kent). Opportunistic: SAM test.
+
| Production 85uA
| Cavity lock commissioning completed
+
|  
|-
 
| rowspan="3" | Thursday, June 27
 
| Owl
 
| Optics (db scan), Q2 measurement, detector alignment
 
| db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon
 
 
|-
 
|-
| Day
+
| Swing
| Send beam through Compton chicane, Compton commissioning.
+
| Production 85uA
| Fail to send beam through compton chicane
+
|
 
|-
 
|-
| Swing
+
| rowspan="3" | Saturday, September 7
| Rate scan (Dustin) and SAM shutter test, raster size verification
+
| Owl
| All completed
+
| Production 85uA
|- style="background: #FCF3CF;
 
| rowspan="3" | Friday, June 28
 
| Owl  
 
| Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-()
 
|
 
|- style="background: #FCF3CF;
 
| Day
 
| Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning
 
|
 
|- style="background: #FCF3CF;
 
| Swing
 
| Compton commissioning, current + PITA scan, finish up high current test, BMW
 
 
|
 
|
|-  
+
|-
| rowspan="3" | Saturday, June 29
+
| Day
| Owl
+
| Production 85uA
| Production (natural Pb, Carbon)
 
 
|  
 
|  
 
|-
 
|-
| Day
+
| Swing
| Production with 208Pb?
+
| Production 85uA
| Rate studies, Phase 1.
+
|
 
|-
 
|-
| Swing
+
|-style="background: #FCF3CF;
| Sweep + access
+
| rowspan="3" | Sunday, September 8
| Phase 2 rate studies
+
| Owl
|-  
+
| Production 85uA
| rowspan="3" | Sunday, June 30
+
|
| Owl  
 
| 208Pb Production  
 
| Target Fleet Commissioning
 
 
|-
 
|-
| Day  
+
| Day
| Moller commissioning.
+
| Moller Polarimetry
 
|  
 
|  
 
|-
 
|-
| Swing  
+
| Swing
| Optics - Y target finding, Bandwidth.
+
| Q2 measurement and Spectrometer rescattering
|  
+
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
 +
|-
 +
| rowspan="3" | Monday, September 9
 +
| Owl
 +
| Production 85uA
 +
|
 +
|-
 +
| Day
 +
| SADness
 +
| Scheduled Accelerator Down begins
 
|}
 
|}
 +
[[Run plan history | <B>Previous Daily Run Plans</B>]]
  
 
== Instructions for RC ==
 
== Instructions for RC ==

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting