Line 1: Line 1:
<span style="color:red">In the process of editing and updating this page. Please contact Juliette Mammei <B>[mailto:crowder@jlab.org?Subject=PREXwiki crowder@jlab.org]</B> with questions or suggestions.</span>
+
 
 
<br><br>
 
<br><br>
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br>
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
  
[[PREX2RunPlan2019 | Global Run Plan]]
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
  
 
== Current Daily Run Plans ==
 
== Current Daily Run Plans ==
Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 +
 
|-
 
|-
| rowspan="3" | Tuesday, June 25
+
| rowspan="3" | Wedsday, September 4
| Owl  
+
| Owl
|  
+
| Production 71uA
| No beam. shift cancelled.
+
|
 
|-
 
|-
| Day  
+
| Day
| Target cooling down.
+
| Moller
| shift cancelled
 
|-
 
| Swing
 
| Optics.
 
| Vacuum issue. No beam for the whole shift.
 
|- 
 
| rowspan="3" | Wednesday, June 26
 
| Owl
 
| Optics.
 
 
|  
 
|  
 
|-
 
|-
| Day
+
| Swing
| Optics. Send beam through Compton chicane.
+
| Moller
| Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened.
+
|
|-
 
| Swing  
 
| Low current cavity lock test. Optics.  Q^2 measurement (Bob or Kent). Opportunistic: SAM test.
 
| Cavity lock commissioning completed
 
|-
 
| rowspan="3" | Thursday, June 27
 
| Owl
 
| Optics (db scan), Q2 measurement, detector alignment
 
| db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon
 
|-
 
| Day
 
| Send beam through Compton chicane, Compton commissioning.
 
| Fail to send beam through compton chicane
 
 
|-
 
|-
| Swing
+
| rowspan="3" | Thursday, September 5
| Rate scan (Dustin) and SAM shutter test, raster size verification
+
| Owl
| All completed
+
| Production 71uA
 +
|
 
|-
 
|-
| rowspan="3" | Friday, June 28
+
| Day
| Owl
+
| Mott polarimetry measurements
| Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-()
 
 
|  
 
|  
 
|-
 
|-
| Day
+
| Swing
| Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning
+
| Production 71uA
|
+
|
|-
 
| Swing  
 
| Compton commissioning, current + PITA scan, finish up high current test, BMW
 
| Unable to finish any of the task in the list, beam restoration procedure performed throughout the swing shift. Harp scan (similar spot size compared to yesterday, x ~100um, y ~ 550um). Established raster size, FFB.
 
|-
 
| rowspan="3" | Saturday, June 29
 
| Owl
 
|Production (natural Pb, Carbon)
 
| Down due to target vacuum problem
 
|-
 
| Day
 
| Production with 208Pb? Rate studies, Phase 1.
 
| Down due to target vacuum problem
 
|-
 
| Swing
 
| Sweep + access. Phase 2 rate studies
 
| Down due to target vacuum problem
 
|-
 
| rowspan="3" | Sunday, June 30
 
| Owl
 
| 208Pb Production. Target Fleet Commissioning
 
| Down due to target vacuum problem
 
 
|-
 
|-
| Day
+
| rowspan="3" | Friday, September 6
| Moller commissioning.
+
| Owl
| Down due to target vacuum problem
+
| Production 71uA
 +
|
 
|-
 
|-
| Swing
+
| Day
| Optics - Y target finding, Bandwidth. Collimator heating axis study.
+
| Production 85uA
| Down due to target vacuum problem
 
|-
 
| rowspan="3" | Monday, July 1
 
| Owl
 
 
|  
 
|  
| Down due to target vacuum problem
 
 
|-
 
|-
| Day
+
| Swing
| Beam Studies
+
| Production 85uA
| Target vacuum leak source found, recovery in progress
+
|
 
|-
 
|-
| Swing
+
| rowspan="3" | Saturday, September 7
|  
+
| Owl
| Site power loss while ramping up HRS magnets after target cool down
+
| Production 85uA
 +
|
 
|-
 
|-
| rowspan="3" | Tuesday, July 2
+
| Day
| Owl
+
| Production 85uA
 
|  
 
|  
| Down due to the site power loss, https://logbooks.jlab.org/entry/3697845
 
 
|-
 
|-
| Day
+
| Swing
|  
+
| Production 85uA
| Down due to the site power loss
+
|
 
|-
 
|-
| Swing
 
|
 
| Down due to the site power loss
 
|-style="background: #FCF3CF;
 
| rowspan="3" | Wednesday, July 3
 
| Owl
 
|
 
| Down due to the site power loss
 
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
| Day
+
| rowspan="3" | Sunday, September 8
|
+
| Owl
| Still down from the power loss, CHL started CT recovery and perhaps 2K pumpdown in the afternoon <br> Currently we are: <br> Sieve OUT <br> Integrating mode detector <br> Raster off (tested ok yesterday) <br> Cavity in low current mode
+
| Production 85uA
|-style="background: #FCF3CF;
+
|
| Swing
 
|
 
|
 
|-
 
| rowspan="3" | Thursday, July 4
 
| Owl  
 
|  
 
| Restricted
 
|-
 
| Day
 
|
 
| Restricted
 
|-
 
| Swing
 
|
 
| Restricted
 
 
|-
 
|-
| rowspan="3" | Friday, July 5
+
| Day
| Owl
+
| Moller Polarimetry
 
|  
 
|  
| Restricted
 
|-
 
| Day
 
| Target cool down, Magnet ramp up
 
| Restricted->Controlled access
 
|-
 
| Swing
 
| Cold target monitoring, Magnet ramp up
 
| Hall to Power permit upon completion of Compton work, 5-8pm Cryo ready in SL, 8-12pm phase the SL
 
|-
 
| rowspan="3" | Saturday, July 6
 
| Owl
 
| Cold target monitoring.
 
| Power outage in SL, no beam
 
|-
 
| Day
 
| Got 70uA to dump, then Cold target monitoring.
 
| 8am - 5S optics, tune B after 5S
 
|-
 
| Swing
 
| Cold target monitoring.
 
| Tuned accelerator, took beam away, 5S optics, tune B after 5S
 
|-
 
| rowspan="3" | Sunday, July 7
 
|Owl
 
| Cold target monitoring.
 
| Tuned accelerator, took beam away, 5S optics, tune B after 5S
 
|-
 
|Day
 
| low current cav commissioning (for EPICS) and beamline optics, High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 
| Tuned C, then tune beam to A, waiting for Production CW
 
|-
 
|Swing
 
| High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 
| hope for Production CW
 
 
|-
 
|-
| rowspan="3" | Monday, July 8
+
| Swing
|Owl
+
| Q2 measurement and Spectrometer rescattering
| High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
+
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
| Production CW , bleed through & tuning to Compton? tuning hallC?
 
 
|-
 
|-
|Day
+
| rowspan="3" | Monday, September 9
|Moller Commissioning/ Tune through Compton
+
| Owl
|Production CW , bleed through & tuning to Compton? tuning hallC? tuning to HallB?
+
| Production 85uA
 +
|
 
|-
 
|-
|Swing
+
| Day
|Moller Commissioning/Tune through Compton
+
| SADness
|roduction CW , bleed through & tuning to Compton? tuning hallC? tuning to HallB?
+
| Scheduled Accelerator Down begins
 
|}
 
|}
 +
[[Run plan history | <B>Previous Daily Run Plans</B>]]
  
 
== Instructions for RC ==
 
== Instructions for RC ==

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting