Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
m
 
(59 intermediate revisions by 8 users not shown)
Line 1: Line 1:
  
 
<br><br>
 
<br><br>
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br>
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
  
[[PREX2RunPlan2019 | Global Run Plan]]
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
  
 
== Current Daily Run Plans ==
 
== Current Daily Run Plans ==
Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 +
 
|-
 
|-
| rowspan="3" | Tuesday, July 30
+
| rowspan="3" | Wedsday, September 4
|Owl
+
| Owl
|low current running beginning at 8am (if approved)
+
| Production 71uA
 
|
 
|
 
|-
 
|-
 
| Day
 
| Day
| Target fix
+
| Moller
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
|  
+
| Moller
* Tests with no target
+
|
# collimator centering angles with tune beam
 
# BCM calibrations
 
# BPM calibrations
 
# position feedback study
 
|  
 
 
|-
 
|-
| rowspan="3" | Wednesday, July 31
+
| rowspan="3" | Thursday, September 5
|Owl
+
| Owl
|production at 70uA
+
| Production 71uA
 
|
 
|
 
|-
 
|-
 
| Day
 
| Day
|
+
| Mott polarimetry measurements
# HRS quad repairs
 
# target repairs
 
# Compton work
 
# BCM repair
 
 
|  
 
|  
# HRS quad repairs - both operational; nothing really done to right
 
# target repairs - mechanical work done, modifying software for new setpoints
 
# Compton work ongoing
 
# 2nd one working as well as we can tell
 
 
|-
 
|-
 
| Swing
 
| Swing
 +
| Production 71uA
 
|
 
|
# Raster check
 
# Detector alignment (low current)
 
#* Main detectors
 
#* AT detectors
 
# BCM test and Current and Pita scans
 
# production at 70uA
 
|
 
 
|-
 
|-
| rowspan="3" | Thursday, August 1
+
| rowspan="3" | Friday, September 6
 
| Owl
 
| Owl
| production at 70uA
+
| Production 71uA
|
 
|-
 
| Day
 
| production at 70uA
 
|
 
|-
 
| Swing
 
| Production running at 70uA
 
|
 
|-
 
| rowspan="3" | Friday, August 2
 
|Owl
 
| Production running at 70uA
 
 
|
 
|
 
|-
 
|-
 
| Day
 
| Day
 +
| Production 85uA
 
|  
 
|  
# Wien flip starting at 8:30am
 
# Compton work in the hall: lens, mode-matching, PPLN tuning
 
#Production 70uA; (IHWP OUT, start slug 26)
 
|raster changed to 4 x 5 mm2 for slug 26
 
 
|-
 
|-
 
| Swing
 
| Swing
|Production running at 70uA
+
| Production 85uA
|
 
|-
 
| rowspan="3" | Saturday, August 3
 
| Owl
 
| Production running at 70uA
 
|
 
|-
 
| Day
 
 
|
 
|
# Address issues-- Col. temps, and increased det. widths
 
#Production running at 70uA
 
| changed to Pb9 target
 
 
|-
 
|-
| Swing
+
| rowspan="3" | Saturday, September 7
| Production running at 70uA
 
|
 
|-
 
| rowspan="3" | Sunday, August 4
 
 
| Owl
 
| Owl
| Production running at 70uA
+
| Production 85uA
 
|
 
|
 
|-
 
|-
 
| Day
 
| Day
| Moller starting at 8am
+
| Production 85uA
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
| more Moller
+
| Production 85uA
|  
+
|
 
|-
 
|-
| rowspan="3" | Monday, August 5
+
|-style="background: #FCF3CF;
 +
| rowspan="3" | Sunday, September 8
 
| Owl
 
| Owl
| more Moller
+
| Production 85uA
 
|
 
|
 
|-
 
|-
 
| Day
 
| Day
|
+
| Moller Polarimetry
# Compton work in Hall
 
#Production running at 70uA
 
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Production running at 70uA 
+
| Q2 measurement and Spectrometer rescattering
|  
+
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
 
|-
 
|-
| rowspan="3" | Tuesday, August 6
+
| rowspan="3" | Monday, September 9
 
| Owl
 
| Owl
| Production running at 70uA
+
| Production 85uA
 
|
 
|
 
|-
 
|-
 
| Day
 
| Day
|
+
| SADness
# Production until 10:30 am
+
| Scheduled Accelerator Down begins
#Controlled access for Compton work
 
|
 
|-
 
| Swing
 
| Production running at 70uA
 
|
 
|-style="background: #FCF3CF;
 
| rowspan="3" | Wednesday, August 7
 
| Owl
 
| Production running at 70uA
 
|
 
|-style="background: #FCF3CF;
 
| Day
 
| Production running at 70uA
 
| Possible time for transverse beam polarization measurements
 
|-style="background: #FCF3CF;
 
| Swing
 
| Production running at 70uA
 
|
 
|-
 
| rowspan="3" | Thursday, August 8
 
| Owl
 
| Production running at 70uA
 
|
 
|-
 
| Day
 
| Production running at 70uA
 
| Possible time for transverse beam polarization measurements
 
|-
 
| Swing
 
| Production running at 70uA
 
|
 
|-
 
| rowspan="3" | Friday, August 9
 
| Owl
 
| Production running at 70uA
 
|
 
|-
 
| Day
 
| Production running at 70uA
 
| Possible time for transverse beam polarization measurements
 
|-
 
| Swing
 
| Production running at 70uA
 
|  
 
 
|}
 
|}
 
 
[[Run plan history | <B>Previous Daily Run Plans</B>]]
 
[[Run plan history | <B>Previous Daily Run Plans</B>]]
  

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting