Difference between revisions of "WAC Notes August 8 2019"

From PREX Wiki
Jump to navigationJump to search
 
(One intermediate revision by the same user not shown)
Line 50: Line 50:
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==
 
+
Perfect Beam!
 
 
  
 
== Pedestal/Calibrations Updates ==
 
== Pedestal/Calibrations Updates ==
Line 57: Line 56:
  
 
== Issues ==
 
== Issues ==
 
+
* Analog DD problem is in the DS BCM probably: https://logbooks.jlab.org/entry/3716220
 +
* PQB after wien flip: https://logbooks.jlab.org/entry/3715986, https://logbooks.jlab.org/entry/3715630
  
 
== Other Status Updates ==
 
== Other Status Updates ==
 
+
* Looking at non-linearity with various scans: https://logbooks.jlab.org/entry/3716628, https://logbooks.jlab.org/entry/3716617, https://logbooks.jlab.org/entry/3716213, https://logbooks.jlab.org/entry/3715630
 
[[Category:WAC]]
 
[[Category:WAC]]

Latest revision as of 11:48, 9 August 2019

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes August 7 2019 << >> WAC Notes August 9 2019

August 8 2019

Daily Meeting BlueJeans

Production Run List - Slug 33 - OUT

Cameron takes over beginning with Slug 33

Slug 33(IHWP IN), begins at run 3931

Production Run List - Slug 34 - IN

Non-Production Runs and Bad Runs

Perfect Beam!

Pedestal/Calibrations Updates

New compton BPM pedestals: https://logbooks.jlab.org/entry/3716683

Issues

Other Status Updates