Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
m
 
(26 intermediate revisions by 7 users not shown)
Line 1: Line 1:
  
 
<br><br>
 
<br><br>
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br>
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
  
[[PREX2RunPlan2019 | Global Run Plan]]
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
  
 
== Current Daily Run Plans ==
 
== Current Daily Run Plans ==
Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 +
 
|-
 
|-
| rowspan="3" | Monday, August 12
+
| rowspan="3" | Wedsday, September 4
 
| Owl
 
| Owl
| Production running at 70uA with
+
| Production 71uA
|  
+
|
 
|-
 
|-
 
| Day
 
| Day
|  
+
| Moller
# Production running at 70uA
 
# Commissioning targets required for Transverse measurements include raster size calibrations
 
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Production running at 70uA
+
| Moller
 +
|
 
|-
 
|-
| rowspan="3" | Tuesday, August 13
+
| rowspan="3" | Thursday, September 5
 
| Owl
 
| Owl
| Production running at 70uA
+
| Production 71uA
|  
+
|
 
|-
 
|-
 
| Day
 
| Day
 +
| Mott polarimetry measurements
 
|  
 
|  
# Planned accelerator downtime:Beam studies
 
# Preparations for Transverse Polarized Measurement
 
 
|-
 
|-
 
| Swing
 
| Swing
| Transverse Polarized Measurement
+
| Production 71uA
|  
+
|
 
|-
 
|-
| rowspan="3" | Wednesday, August 14
+
| rowspan="3" | Friday, September 6
 
| Owl
 
| Owl
| Transverse Polarized Measurement
+
| Production 71uA
|
 
|-
 
| Day
 
|
 
# Transverse Polarized Measurement
 
# Wein Flip back to `Right'
 
|
 
# Transverse work done at ~10:30.
 
# Hand things off to OPS for beam studies and Wien flip.
 
|-Cornejo
 
| Swing
 
# Establish PQB after Wien flip
 
# PITA scan
 
| Production running at 70uA
 
 
|
 
|
# Caryn checks PQB (at ILD). Done by ~16:30
 
# PITA scan ~18:45
 
# Moved to D5-208Pb8-D6 target ~20:45
 
|-
 
| rowspan="3" | Thursday, August 15
 
| Owl
 
| Production running at 70uA
 
|
 
 
|-
 
|-
 
| Day
 
| Day
| Production running at 70uA
+
| Production 85uA
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Production running at 70uA
+
| Production 85uA
 
|
 
|
# Target out for Compton background studies
 
# Production back on Pb#8
 
 
|-
 
|-
| rowspan="3" | Friday, August 16
+
| rowspan="3" | Saturday, September 7
 
| Owl
 
| Owl
| Production running at 70uA
+
| Production 85uA
| Beam off at 7 AM to cool down the hall prior to Compton work
+
|
 
|-
 
|-
 
| Day
 
| Day
|
+
| Production 85uA
# Work in the hall for to replace Compton fiber amp
+
|  
# Jessie will work on Tungsten Collimator flow reedback issue
 
|
 
# Jack added additional shielding around the hall
 
# Dave, Amali and Caryn worked on the laser
 
# CHL problems starting at 12:03 means no opportunity of beam during shift
 
 
|-
 
|-
 
| Swing
 
| Swing
| Production running at 70uA
+
| Production 85uA
| No beam due to CHL and Hall B restore
 
|-
 
| rowspan="3" | Saturday, August 17
 
| Owl
 
| Production running at 70uA
 
| No beam due to CHL and Hall B restore
 
|-
 
| Day
 
| Production running at 70uA
 
 
|
 
|
# Beam returns around 8:30 AM
 
 
|-
 
|-
| Swing
 
| Production running at 70uA
 
|
 
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
| rowspan="3" | Sunday, August 18
+
| rowspan="3" | Sunday, September 8
 
| Owl
 
| Owl
| Production running at 70uA
+
| Production 85uA
|
 
|-style="background: #FCF3CF;
 
| Day
 
| Moller measurement
 
|
 
|-style="background: #FCF3CF;
 
| Swing
 
| Production running at 70uA
 
 
|
 
|
# Moller measurement concluded
 
# 70 uA beam restored to hall
 
# Production running
 
|-
 
| rowspan="3" | Monday, August 19
 
| Owl
 
| Production running at 70uA
 
|
 
 
|-
 
|-
 
| Day
 
| Day
| Production running at 70uA
+
| Moller Polarimetry
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Production running at 70uA
+
| Q2 measurement and Spectrometer rescattering
|
+
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
 
|-
 
|-
| rowspan="3" | Tuesday, August 20
+
| rowspan="3" | Monday, September 9
 
| Owl
 
| Owl
| Production running at 70uA
+
| Production 85uA
|  
+
|
 
|-
 
|-
 
| Day
 
| Day
|  
+
| SADness
|  
+
| Scheduled Accelerator Down begins
|-
 
| Swing
 
|
 
|
 
 
|}
 
|}
 
 
[[Run plan history | <B>Previous Daily Run Plans</B>]]
 
[[Run plan history | <B>Previous Daily Run Plans</B>]]
  

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting