Difference between revisions of "WAC Notes February 2 2020"
From PREX Wiki
Jump to navigationJump to search (→Issues) |
(→Issues) |
||
Line 50: | Line 50: | ||
* very large asym_bpm2i01WS_mean in slug 127: ~13.8 ppm (compared to previous value of < 5 ppm) | * very large asym_bpm2i01WS_mean in slug 127: ~13.8 ppm (compared to previous value of < 5 ppm) | ||
+ | * due to work in arc 8 box supply, no beam at all during the day and swing shift, beam comes back at about 21:30; but beam spot size tuning and compton work blocks production until 1:45 am the next day | ||
== Updates == | == Updates == |
Revision as of 13:56, 3 February 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes February 1 2020 << >> WAC Notes February 3 2020
February 2 2020
Daily Meeting BlueJeans
Production Run List - Slug 126 - IHWP IN - Flip-RIGHT - Production
continue slug 126 from February 1:
Production Run List - Slug 127 - IHWP OUT - Flip-RIGHT - Production
this slug at about 4 am
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
Issues
- very large asym_bpm2i01WS_mean in slug 127: ~13.8 ppm (compared to previous value of < 5 ppm)
- due to work in arc 8 box supply, no beam at all during the day and swing shift, beam comes back at about 21:30; but beam spot size tuning and compton work blocks production until 1:45 am the next day