Difference between revisions of "WAC Notes September 5 2020"

From PREX Wiki
Jump to navigationJump to search
Line 31: Line 31:
  
 
=== Production Run List - Slug 213 - IHWP OUT  - Flip-RIGHT - Production ===
 
=== Production Run List - Slug 213 - IHWP OUT  - Flip-RIGHT - Production ===
* Suspicious - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8243_000 Run 8243] so short
+
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8243_000 Run 8243] short
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8244_000 Run 8244]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8244_000 Run 8244]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8245_000 Run 8245]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8245_000 Run 8245]

Revision as of 14:24, 9 September 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes September 4 2020 << >> WAC Notes September 6 2020

September 5 2020

Daily Meeting BlueJeans

Production Run List - Slug 213 - IHWP OUT - Flip-RIGHT - Production

Production Run List - Slug 214 - IHWP IN - Flip-RIGHT - Production

Production Run List - Slug 213 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

  • 8231-8237 linac down
  • Bad - Run 8247 0 beam current
  • 8248-8254 more downtime

Issues

the accelerator went down after the moller measurement

Updates