Difference between revisions of "PREX/CREX Jun 15 2017 11:00am EDT"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> PREX/CREX_Teleconferences previous meeting << >> [[PREX/CREX_Jun_15_2017_11:00am_EDT|following ...")
 
Line 18: Line 18:
 
#* CG: ready with preliminary version of RSAD
 
#* CG: ready with preliminary version of RSAD
 
#* CG: Running simulation to see the effect of keeping the aperture (donut) in on the ion chambers
 
#* CG: Running simulation to see the effect of keeping the aperture (donut) in on the ion chambers
#* CG: Took pictures of the septum [https://ace.phys.virginia.edu:80/HAPPEX/3428 haplog3428]. Jack remembered that we need to fabricate another coil, however on closer inspection of the septum he noticed that things looked ok. He will investigate. The septum beam pipe is being held by RadCon because of activation. Dave pointed out that trying to reuse it (which we don't want since it's stainless steel) would not be ALARA.  
+
#* CG: Took pictures of the septum [https://ace.phys.virginia.edu:80/HAPPEX/3428 haplog3428]. Jack remembered that we need to fabricate another coil, however on closer inspection of the septum he noticed that things looked ok. He will investigate. The septum beam pipe is being held by RadCon because of activation. Dave pointed out that trying to reuse it (which we don't want since it's stainless steel) would not be ALARA.
 +
#* CG: Thia announced officially that the call for beam requests will be go out on July 1st and the deadline will be July 31st. She also pointed out that the report on the PREX/CREX ERR is out (she reminded Jessie that one of the recommendations is to rad harden the cooling hoses on Q1).
  
 
== Attendance ==
 
== Attendance ==

Revision as of 09:43, 14 June 2017

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting


Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 PARTICIPANT CODE:                  913380354#
 Room IRL:                            CEBAF F228


Agenda

  1. Ciprian: fringe field modeling
    • comments
  2. Ciprian: Other
    • CG: ready with preliminary version of RSAD
    • CG: Running simulation to see the effect of keeping the aperture (donut) in on the ion chambers
    • CG: Took pictures of the septum haplog3428. Jack remembered that we need to fabricate another coil, however on closer inspection of the septum he noticed that things looked ok. He will investigate. The septum beam pipe is being held by RadCon because of activation. Dave pointed out that trying to reuse it (which we don't want since it's stainless steel) would not be ALARA.
    • CG: Thia announced officially that the call for beam requests will be go out on July 1st and the deadline will be July 31st. She also pointed out that the report on the PREX/CREX ERR is out (she reminded Jessie that one of the recommendations is to rad harden the cooling hoses on Q1).

Attendance

Excused:

Dave G, Silviu D, Victoria O.,