Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 15: Line 15:
 
<td> pump down; Møller, Compton, septum install; Q2 repair<br />
 
<td> pump down; Møller, Compton, septum install; Q2 repair<br />
 
Insert sieve. </td>
 
Insert sieve. </td>
<td> Techs </td><td>in progress</td></tr>
+
<td> Techs </td><td></td></tr>
 
<tr> <td> 03/19 </td><td> swing </td><td> Beam restore</td><td> B-team </td> <td> not done</td></tr>
 
<tr> <td> 03/19 </td><td> swing </td><td> Beam restore</td><td> B-team </td> <td> not done</td></tr>
 
<tr> <td> 03/20 </td><td> owl </td>
 
<tr> <td> 03/20 </td><td> owl </td>
Line 25: Line 25:
 
Quartz detectors checkout<br />
 
Quartz detectors checkout<br />
 
GEM checkout<br />
 
GEM checkout<br />
Lumi checkout<br />
 
 
----
 
----
 
All at 1-2 µA.
 
All at 1-2 µA.
Line 31: Line 30:
 
<td> <font color="red">Michaels, LeRose</font>
 
<td> <font color="red">Michaels, LeRose</font>
 
<br />
 
<br />
Michaels<br />
+
Michaels, Zafar<br />
 
Michaels<br />
 
Michaels<br />
 
McNulty, Camsonne, Michaels<br />
 
McNulty, Camsonne, Michaels<br />
McNulty, Decowski, Wexler<br />
+
McNulty, Wexler<br />
Hansen, Camsonne, Liyanage<br />
+
Camsonne<br />
Silwal, Mercado, D. Wang
 
 
----
 
----
 
<br />
 
<br />
 
</td><td>not done</td> </tr>
 
</td><td>not done</td> </tr>
 
<tr> <td> 03/20 </td><td> day </td>
 
<tr> <td> 03/20 </td><td> day </td>
<td> Møller, Compton install<br />
+
<td> Quads repair; Møller, Compton install<br />
 
Remove sieve</td>
 
Remove sieve</td>
 
<td> Techs </td><td>not done</td></tr>
 
<td> Techs </td><td>not done</td></tr>

Revision as of 21:43, 19 March 2010

Daily Run Plan

Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.

Last update: Mar 19, 2010.


Daily Run Plan for PREX   (latest at bottom)
Date (2010) Shift ---------- Activity ------------ Responsible ----- Status ---
03/19 day pump down; Møller, Compton, septum install; Q2 repair
Insert sieve.
Techs
03/19 swing Beam restore B-team not done
03/20 owl Septum checkout

also:
Initial look at low current cavity monitors
Target alignment
VDC checkout
Quartz detectors checkout
GEM checkout


All at 1-2 µA.

Michaels, LeRose


Michaels, Zafar
Michaels
McNulty, Camsonne, Michaels
McNulty, Wexler
Camsonne



not done
03/20 day Quads repair; Møller, Compton install
Remove sieve
Techs not done
03/20 swing Low current cavity monitors setup

Spectrometer checkout
VDC checkout
Quartz detectors checkout
GEM checkout
Lumi checkout


All at <~ 100 nA.

Musson

McNulty, Camsonne, Michaels
McNulty, Decowski, Wexler
Hansen, Camsonne, Liyanage
Silwal, Mercado, D. Wang



not done