<caption> Daily Run Plan for PREX &nbsp; (latest at bottom)
 
<caption> Daily Run Plan for PREX &nbsp; (latest at bottom)
 
</caption>
 
</caption>
<tr> <th> Date (2010) </th><th> Shift </th><th>---------- Activity ----------</th><th>-- Responsible --</th><th>--- Status ---</th></tr>
+
<tr> <th> Date (2010) </th><th> Shift </th><th>---------- Activity (Responsible) ----------</th><th>---&nbsp;Status&nbsp;---</th></tr>
 
<tr> <td> 03/19 </td><td> day </td>
 
<tr> <td> 03/19 </td><td> day </td>
 
<td> pump down; Møller, Compton, septum install; Q2 repair<br />
 
<td> pump down; Møller, Compton, septum install; Q2 repair<br />
Insert sieve. </td>
+
Insert sieve. (Techs) </td><td></td></tr>
<td> Techs </td><td></td></tr>
+
<tr> <td> 03/19 </td><td> swing </td><td> Beam restore (B-team) </td> <td> not done</td></tr>
<tr> <td> 03/19 </td><td> swing </td><td> Beam restore</td><td> B-team </td> <td> not done</td></tr>
 
 
<tr> <td> 03/20 </td><td> owl </td>
 
<tr> <td> 03/20 </td><td> owl </td>
<td> <font color="red">Septum checkout</font>  
+
<td> <font color="red">Septum checkout (Michaels: Page when beam imminent & spectrometer ready)</font>  
 
also:<br />
 
also:<br />
Initial look at low current cavity monitors<br />
+
Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready)<br />
Target alignment<br />
+
Target alignment (Michaels)<br />
VDC checkout<br />
+
VDC checkout (Michaels)<br />
Quartz detectors checkout<br />
+
Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)<br />
GEM checkout<br />
+
GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)<br />
 
----
 
----
All at 1-2 µA.
+
All at 1-2 µA.<br />
 +
Scattered energy ~ beam energy = 1.063 GeV.<br />
 +
Quad settings: <br />
 +
Right arm:<br />
 +
Q1: dI/dP= 411.2474 Amps/GeV/c<br />
 +
Q2: dI/dP= 436.2014 Amps/GeV/c<br />
 +
Q3: dI/dP= 433.3897 Amps/GeV/c<br />
 +
 
 +
Left Arm:<br />
 +
Q1: dI/dP= 419.8772 Amps/GeV/c<br />
 +
Q2: dI/dP= 435.6273 Amps/GeV/c<br />
 +
Q3: dI/dP= 434.9682 Amps/GeV/c<br />
 
</td>
 
</td>
<td> <font color="red">Michaels, LeRose</font>
+
<td>not done</td> </tr>
<br />
 
Michaels, Zafar<br />
 
Michaels<br />
 
McNulty, Camsonne, Michaels<br />
 
McNulty, Wexler<br />
 
Camsonne<br />
 
----
 
<br />
 
</td><td>not done</td> </tr>
 
 
<tr> <td> 03/20 </td><td> day </td>
 
<tr> <td> 03/20 </td><td> day </td>
<td> Quads repair; Compton install<br />
+
<td> Beam off & hall open 9:00 am<br />
Remove sieve</td>
+
Quads repair; Compton install<br />
<td> Techs </td><td>not done</td></tr>
+
Remove sieve (Techs) </td><td>not done</td></tr>
 
<tr> <td> 03/20 </td><td> swing </td>
 
<tr> <td> 03/20 </td><td> swing </td>
<td> <font color="red">Low current cavity monitors setup</font>
+
<td> <font color="red">Low current cavity monitors setup (Musson)</font>
 
<font color="red">Spectrometer checkout</font> <br />
 
<font color="red">Spectrometer checkout</font> <br />
 
VDC checkout<br />
 
VDC checkout<br />
Line 51: Line 52:
 
----
 
----
 
All at <~ 100 nA. </td>
 
All at <~ 100 nA. </td>
<td>
+
<td>not done</td> </tr>
<font color="red">Musson</font><br /><br />
 
McNulty, Camsonne, Michaels<br />
 
McNulty, Decowski, Wexler<br />
 
Hansen, Camsonne, Liyanage<br />
 
Silwal, Mercado, D. Wang
 
----
 
<br /></td><td>not done</td> </tr>
 
 
</table>
 
</table>

Revision as of 23:13, 19 March 2010

Daily Run Plan

Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.

Last update: Mar 19, 2010.


Daily Run Plan for PREX   (latest at bottom)
Date (2010) Shift ---------- Activity (Responsible) ------------- Status ---
03/19 day pump down; Møller, Compton, septum install; Q2 repair
Insert sieve. (Techs)
03/19 swing Beam restore (B-team) not done
03/20 owl Septum checkout (Michaels: Page when beam imminent & spectrometer ready)

also:
Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready)
Target alignment (Michaels)
VDC checkout (Michaels)
Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)
GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)


All at 1-2 µA.
Scattered energy ~ beam energy = 1.063 GeV.
Quad settings:
Right arm:
Q1: dI/dP= 411.2474 Amps/GeV/c
Q2: dI/dP= 436.2014 Amps/GeV/c
Q3: dI/dP= 433.3897 Amps/GeV/c

Left Arm:
Q1: dI/dP= 419.8772 Amps/GeV/c
Q2: dI/dP= 435.6273 Amps/GeV/c
Q3: dI/dP= 434.9682 Amps/GeV/c

not done
03/20 day Beam off & hall open 9:00 am

Quads repair; Compton install

Remove sieve (Techs)
not done
03/20 swing Low current cavity monitors setup (Musson)

Spectrometer checkout
VDC checkout
Quartz detectors checkout
GEM checkout
Lumi checkout


All at <~ 100 nA.
not done