− | + | {| border="1" | |
− | + | |+ Daily Run Plan for PREX (latest at bottom) | |
− | + | ! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!--- Status --- | |
− | + | |- | |
− | + | | 03/19 | |
− | + | | day | |
− | Insert sieve. (Techs) | + | | pump down; Møller, Compton, septum install; Q2 repair<br /> |
− | + | Insert sieve. (Techs) | |
− | + | | | |
− | + | |- | |
− | also: | + | | 03/19 |
− | Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready) | + | | swing |
− | Target alignment (Michaels) | + | | Beam restore (B-team) |
− | VDC checkout (Michaels) | + | | done |
− | Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen) | + | |- |
− | GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating) | + | | 03/20 |
+ | | owl | ||
+ | | | ||
+ | * <font color="red">Septum checkout (Michaels: Page when beam imminent & spectrometer ready)</font> | ||
+ | also: | ||
+ | * Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready) | ||
+ | * Target alignment (Michaels) | ||
+ | * VDC checkout (Michaels) | ||
+ | * Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen) | ||
+ | * GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating) | ||
---- | ---- | ||
All at 1-2 µA.<br /> | All at 1-2 µA.<br /> | ||
Scattered energy ~ beam energy = 1.063 GeV.<br /> | Scattered energy ~ beam energy = 1.063 GeV.<br /> | ||
− | Quad settings: | + | Quad settings: |
− | Right arm: | + | *Right arm: |
− | Q1: dI/dP= 411.2474 Amps/GeV/c | + | ** Q1: dI/dP= 411.2474 Amps/GeV/c |
− | Q2: dI/dP= 436.2014 Amps/GeV/c | + | ** Q2: dI/dP= 436.2014 Amps/GeV/c |
− | Q3: dI/dP= 433.3897 Amps/GeV/c | + | ** Q3: dI/dP= 433.3897 Amps/GeV/c |
− | + | * Left Arm: | |
− | Left Arm: | + | ** Q1: dI/dP= 419.8772 Amps/GeV/c |
− | Q1: dI/dP= 419.8772 Amps/GeV/c | + | ** Q2: dI/dP= 435.6273 Amps/GeV/c |
− | Q2: dI/dP= 435.6273 Amps/GeV/c | + | ** Q3: dI/dP= 434.9682 Amps/GeV/c |
− | Q3: dI/dP= 434.9682 Amps/GeV/c | + | "Usual" polarity |
− | + | | done | |
− | + | |- | |
− | + | | 03/20 | |
− | + | | day | |
− | Quads repair; Compton install | + | | Beam off & hall open 9:00 am<br /> |
− | + | Quads repair; Compton install. Leave sieves in. (Techs) | |
− | + | | done | |
− | + | |- | |
− | <font color="red">Spectrometer checkout</font | + | | 03/20 |
− | + | | swing | |
− | Quartz detectors checkout | + | | |
− | GEM checkout | + | * Close up hall |
− | Lumi checkout | + | * Benesch tuning (1/2 - 2 hours) |
+ | * Verify quad polarities (Camsonne) | ||
+ | * Cavity monitors basic function test (Michaels, Zafar) | ||
+ | * <font color="red">Low current cavity monitors setup (Musson, Zafar)</font> (2 hours) | ||
+ | * Remove sieves | ||
+ | * <font color="red">Spectrometer checkout:</font> | ||
+ | ** Quartz detectors checkout | ||
+ | ** GEM checkout | ||
+ | ** Lumi checkout (Mercado) (2 µA on Ta) | ||
---- | ---- | ||
− | + | At <~ 100 nA up to few µA. | |
− | + | | not done | |
− | + | |} |
Revision as of 17:42, 20 March 2010
Daily Run Plan
Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- |
---|---|---|---|
03/19 | day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
|
03/19 | swing | Beam restore (B-team) | done |
03/20 | owl |
also:
All at 1-2 µA.
"Usual" polarity |
done |
03/20 | day | Beam off & hall open 9:00 am Quads repair; Compton install. Leave sieves in. (Techs) |
done |
03/20 | swing |
At <~ 100 nA up to few µA. |