(→‎Daily Run Plan: 3/21 swing - 3/22 owl revision)
Line 90: Line 90:
 
|
 
|
 
* <font color="red">Low current cavity monitors setup (Michaels, Zafar)</font>
 
* <font color="red">Low current cavity monitors setup (Michaels, Zafar)</font>
* <font color="red">Pointing measurement (Riordan)</font>
+
* Remove sieves
* Remove sieves (assuming low current cavities working)
+
* Initial look at sieve out data
 +
* Replace sieves
 
| not done
 
| not done
 
|-
 
|-
Line 97: Line 98:
 
| owl
 
| owl
 
|
 
|
* A_T hole?
+
* <font color="red">Pointing measurement (Riordan)</font>
 +
* Remove sieves
 +
* Repeat pointing measurements with no sieves
 +
* If done or unable to continue before 4 am page Luis Mercado to do lumi checks
 +
* After 4 am page Dustin McNulty for detector work
 
|
 
|
 
|-
 
|-
Line 103: Line 108:
 
| day
 
| day
 
| <font color="red">
 
| <font color="red">
* LQ2 repair</font>
+
* Optics (Liyanage)</font>
 
|
 
|
 
|-
 
|-
 
| 3/22
 
| 3/22
 
| swing
 
| swing
| <font color="red">
+
|  
* Pointing measurement</font>
 
 
|
 
|
 
|-
 
|-

Revision as of 21:15, 21 March 2010

Daily Run Plan

Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.


Daily Run Plan for PREX   (latest at bottom)
Date (2010) Shift ---------- Activity (Responsible) ---------- --- Status ---
03/19 day pump down; Møller, Compton, septum install; Q2 repair

Insert sieve. (Techs)

03/19 swing Beam restore (B-team) done
03/20 owl
  • Septum checkout (Michaels: Page when beam imminent & spectrometer ready)

also:

  • Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready)
  • Target alignment (Michaels)
  • VDC checkout (Michaels)
  • Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)
  • GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)

All at 1-2 µA.
Scattered energy ~ beam energy = 1.063 GeV.
Quad settings:

  • Right arm:
    • Q1: dI/dP= 411.2474 Amps/GeV/c
    • Q2: dI/dP= 436.2014 Amps/GeV/c
    • Q3: dI/dP= 433.3897 Amps/GeV/c
  • Left Arm:
    • Q1: dI/dP= 419.8772 Amps/GeV/c
    • Q2: dI/dP= 435.6273 Amps/GeV/c
    • Q3: dI/dP= 434.9682 Amps/GeV/c

"Usual" polarity

done
03/20 day Beam off & hall open 9:00 am

Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs)

done
03/20 swing
  • Close up hall
  • Benesch tuning (1/2 - 2 hours)
  • Verify quad polarities (Camsonne)
  • Cavity monitors basic function test (Zafar)
  • Low current cavity monitors setup (Musson, Zafar)
most done but need access to finish
3/21 owl
  • Low current cavity monitors setup (Musson, Zafar)
  • Access for GEM installation (Camsonne)
most done but need access to finish
3/21 day
  • Spectrometer checkout:
    • Quartz detectors checkout (McNulty, Wexler)
    • Lumi checkout (Mercado) (2 µA on Ta)
    • GEM checkout (Camsonne?)
  • A line tuning (Benesch)
  • Raster checkout
  • Access:
    • Low current cavities
    • Target position
    • Quartz
    • Scintillator alignment
    • LQ2
in progress
3/21 swing
  • Low current cavity monitors setup (Michaels, Zafar)
  • Remove sieves
  • Initial look at sieve out data
  • Replace sieves
not done
3/22 owl
  • Pointing measurement (Riordan)
  • Remove sieves
  • Repeat pointing measurements with no sieves
  • If done or unable to continue before 4 am page Luis Mercado to do lumi checks
  • After 4 am page Dustin McNulty for detector work
3/22 day
  • Optics (Liyanage)
3/22 swing
3/23 owl
3/23 day Beam studies

Remove water target