Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 198: | Line 198: | ||
| | | | ||
*Finish the commissioning of thick Pb target (Bob, Ahmed) | *Finish the commissioning of thick Pb target (Bob, Ahmed) | ||
− | + | |postponed, ACC problems. | |
− | | | ||
|- | |- | ||
| 3/27 | | 3/27 | ||
− | | | + | | Swing |
− | + | *High-current on thick C12, adjust HV (Luis or Bob) | |
+ | *Finish the commissioning of thick Pb target (Bob, Ahmed) | ||
*Electronic Commissioning (KK, Luis, Paul, Jon et al) | *Electronic Commissioning (KK, Luis, Paul, Jon et al) | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
Line 217: | Line 210: | ||
| Owl | | Owl | ||
| | | | ||
− | * | + | *Continue with the above, if necessary. |
+ | *Establishing Parity Measurements, IA feedback, blinding (Rupesh, Jon) | ||
+ | *High Luminosity Commissioning (Rupesh, Luis, Jon, Bob) | ||
| | | | ||
|- | |- | ||
Line 224: | Line 219: | ||
| | | | ||
*Comparison Study of Optics Tunes (Seamus, Nilanga, Kiad) | *Comparison Study of Optics Tunes (Seamus, Nilanga, Kiad) | ||
+ | *Sometime before Monday, submit the ATLIS plan for Dithering test (Rupesh) | ||
| | | | ||
|- | |- | ||
Line 229: | Line 225: | ||
| Swing | | Swing | ||
| | | | ||
+ | *Continue Optics if necessary. | ||
*Continue High Luminosity Commissioning | *Continue High Luminosity Commissioning | ||
| | | | ||
Line 236: | Line 233: | ||
| | | | ||
*Mini-production run (shift crew) | *Mini-production run (shift crew) | ||
− | *Stop beam at | + | *Stop beam at 07:00 or whenever Ed Folts asks to. |
| | | | ||
|- | |- | ||
Line 242: | Line 239: | ||
| Day | | Day | ||
| | | | ||
− | *Open Hall A to | + | *Open Hall A to set up Moller and Compton (Ed Folts, Sasha, Sirish, et.al.) |
+ | *Work on GEMs (Alex, Seamus, et.al.) | ||
+ | *MCC to do beam studies while Hall A open | ||
+ | *Detector linearity/LED tests (Luis) | ||
+ | *Setup WAC analysis (Mark, Mindy) | ||
| | | | ||
|- | |- | ||
Line 249: | Line 250: | ||
| | | | ||
*First Moller Commissioning (Sasha) | *First Moller Commissioning (Sasha) | ||
+ | *Or, if Moller not ready, check Final Alignment of detectors, position A_T (Dustin) | ||
| | | | ||
|- | |- | ||
Line 254: | Line 256: | ||
| Owl | | Owl | ||
| | | | ||
− | *Parity | + | *If opening Hall A during day, do Parity Quality Beam checks(Rupesh, Kent, Mark) |
+ | *If not opening Hall A during day, do quasi-production on Lead (Jon, Ahmed) | ||
| | | | ||
|- | |- | ||
Line 260: | Line 263: | ||
| Day | | Day | ||
| | | | ||
− | * | + | *If Hall A not in access, do the ATLIS plan: Commission Dithering (Rupesh, Kent) |
+ | *If Hall A in access do work on Moller and Compton. | ||
| | | | ||
|} | |} |
Revision as of 16:02, 27 March 2010
Daily Run Plan
Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- | |
---|---|---|---|---|
03/19 | Day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
||
03/19 | Swing | Beam restore (B-team) | done | |
03/20 | Owl |
also:
|
done
All at 1-2 µA.
"Usual" polarity |
done |
03/20 | Day | Beam off & hall open 9:00 am Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) |
done | |
03/20 | Swing |
|
done | |
3/21 | Owl |
|
done but GEMs not ready | |
3/21 | Day |
|
done | |
3/21 | Swing |
|
done | |
3/22 | Owl |
|
done | |
3/22 | Day |
|
done | |
3/22 | Swing |
|
done | |
3/23 | Owl |
|
||
3/23 | Day |
| ||
3/23 | Swing |
|
done | |
3/24 | Owl |
|
done | |
3/24 | Day |
|
done | |
3/24 | Swing |
|
done | |
3/25 | Owl |
|
in progress | |
3/25 | Day |
|
done | |
3/25 | Swing |
|
postponed | |
3/26 | Owl |
|
in progress | |
3/26 | Day |
|
postponed | |
3/26 | Swing |
|
||
3/27 | Owl |
|
postponed, ACC problems. | |
3/27 | Swing
|
|||
3/28 | Owl |
|
||
3/28 | Day |
|
||
3/28 | Swing |
|
||
3/29 | Owl |
|
||
3/29 | Day |
|
||
3/29 | Swing |
|
||
3/30 | Owl |
|
||
3/30 | Day |
|
|