Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 481: | Line 481: | ||
| Swing | | Swing | ||
| | | | ||
− | * | + | * Cancelled |
| | | | ||
|- | |- | ||
Line 487: | Line 487: | ||
| Owl | | Owl | ||
| | | | ||
− | * | + | * Cancelled |
| | | | ||
|- | |- | ||
Line 493: | Line 493: | ||
| Day | | Day | ||
| | | | ||
− | * | + | * Cancelled |
* Possible commissioning of Moller and Compton (TBD) | * Possible commissioning of Moller and Compton (TBD) | ||
| | | | ||
Line 500: | Line 500: | ||
| Swing | | Swing | ||
| | | | ||
− | * | + | * Cancelled |
| | | | ||
|- | |- | ||
Line 506: | Line 506: | ||
| Owl | | Owl | ||
| | | | ||
− | * | + | * Cancelled |
| | | | ||
|- | |- | ||
Line 512: | Line 512: | ||
| Day | | Day | ||
| | | | ||
− | * | + | * Standby |
− | | | + | | Techs are working on vacuum repair. Earliest optimistic startup is Sunday day. Likely later |
|- | |- | ||
| Sunday 11 April | | Sunday 11 April | ||
| Swing | | Swing | ||
| | | | ||
− | * | + | * Standby |
| | | | ||
|- | |- | ||
Line 524: | Line 524: | ||
| Owl | | Owl | ||
| | | | ||
− | * | + | * Standby |
| | | | ||
|- | |- | ||
Line 530: | Line 530: | ||
| Day | | Day | ||
| | | | ||
− | * | + | * Standby |
− | |||
− | |||
| | | | ||
|- | |- | ||
Line 538: | Line 536: | ||
| Swing | | Swing | ||
| | | | ||
− | * | + | * Standby |
+ | * When we resume we may need to re-check alignment (scans of sieve slit and target position) | ||
+ | * If sieves were moved during the vacuum repair we may need to do the water cell angle measurement. | ||
+ | * Eventually we check the alignmenet of the quartz detectors and get back into production. | ||
+ | * Plus a generous amount of time for Moller and Compton Commissioning. | ||
| | | | ||
|} | |} |
Revision as of 13:31, 9 April 2010
Daily Run Plan
Here are details of the daily run plan. See also the Global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- |
---|---|---|---|
03/19 | Day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
done |
03/19 | Swing | Beam restore (B-team) | done |
03/20 | Owl |
also:
|
done
All at 1-2 µA.
"Usual" polarity |
03/20 | Day | Beam off & hall open 9:00 am Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) |
done |
03/20 | Swing |
|
done |
3/21 | Owl |
|
done but GEMs not ready |
3/21 | Day |
|
done |
3/21 | Swing |
|
done |
3/22 | Owl |
|
done |
3/22 | Day |
|
done |
3/22 | Swing |
|
done |
3/23 | Owl |
|
done |
3/23 | Day |
|
water cell removed, rest not finished |
3/23 | Swing |
|
done |
3/24 | Owl |
|
done |
3/24 | Day |
|
done |
3/24 | Swing |
|
done |
3/25 | Owl |
|
in progress |
3/25 | Day |
|
done |
3/25 | Swing |
|
postponed |
3/26 | Owl |
|
in progress |
3/26 | Day |
|
postponed |
3/26 | Swing |
|
partly done |
3/27 | Owl | no beam | |
3/27 | Day | no beam | |
3/27 | Swing |
|
done, high-current tests continue |
3/28 | Owl |
|
not finished |
3/28 | Day |
|
done |
3/28 | Swing |
|
done |
3/29 | Owl |
|
done |
3/29 | Day |
|
done |
3/29 | Swing |
|
done |
3/30 | Owl |
|
done |
3/30 | Day |
|
done, except linearity |
3/30 | Swing |
|
done |
3/31 | Owl |
|
done |
3/31 | Day |
|
done |
3/31 | Swing |
|
Moller was done |
4/1 | Owl |
|
done |
4/1 | Day |
|
done, successful |
4/1 | Swing |
|
done |
Friday 2 April | Owl |
|
partly done, needs more work |
Friday 2 April | Day |
|
done |
Friday 2 April | Swing |
|
done, but not Q2 |
Saturday 3 April | Owl |
|
done |
Saturday 3 April | Day |
|
done, but not yet in prod. |
Saturday 3 April | Swing |
|
done |
Sunday 4 April | Owl |
|
done |
Sunday 4 April | Day |
|
done |
Sunday 4 April | Swing |
|
done |
Monday 5 April | Owl |
|
done |
Monday 5 April | Day |
|
done |
Monday 5 April | Swing |
|
done |
Tuesday 6 April | Owl |
|
partly done |
Tuesday 6 April | Day |
|
postponed: vacuum problems |
Tuesday 6 April | Swing |
|
|
Wednesday 7 April | Owl |
|
|
Wednesday 7 April | Day |
|
Leak found at O-ring connection between target chamber and collimator box |
Wednesday 7 April | Swing |
|
|
Thursday 8 April | Owl |
| |
Thursday 8 April | Day |
|
|
Thursday 8 April | Swing |
|
|
Friday 9 April | Owl |
|
|
Friday 9 April | Day |
|
|
Friday 9 April | Swing |
|
|
Saturday 10 April | Owl |
|
|
Saturday 10 April | Day |
|
|
Saturday 10 April | Swing |
|
|
Sunday 11 April | Owl |
|
|
Sunday 11 April | Day |
|
Techs are working on vacuum repair. Earliest optimistic startup is Sunday day. Likely later |
Sunday 11 April | Swing |
|
|
Monday 12 April | Owl |
|
|
Monday 12 April | Day |
|
|
Monday 12 April | Swing |
|