Line 23: Line 23:
 
# Other issues
 
# Other issues
 
#*  
 
#*  
 +
 +
== Bob's DAQ tasklist ==
 +
  TO-DO list for Parity DAQ
 +
    updated Jan 4, 2019
 +
 +
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13
 +
Tao & Cameron: 8, 9
 +
Bob: 3, 6, 10
 +
Cip, Cameron, Tao: 13 
 +
1 Timing: mostly understood, still small mysteries (LNE)
 +
2 Synchronization-check system. w/help from Ed Jastrzembski
 +
3 File naming, reset run num, finalize configs (INJ, CH, ALL)
 +
4 Fix scalers on spectrometer crates.
 +
5 clean up cabling, labels, fasteners.
 +
6 Clean up CRL -- eliminate so-called "dirty trick"
 +
7 Check the 7200 scaler setup at injector, find a spare 7200.
 +
8 Pedestal studies, aka cross-talk. 
 +
9 Test JAPAN. Need cable map & labels. Possibly maintain "pan" ?
 +
10 Green Monster maintenance.
 +
11 Test spares.  Repair bad modules.
 +
12 Document everything.  Circuit diagrams, cable map, "how to".
 +
13 Online software, a bit undefined since software is changing.
 +
    (a) automatic production of run-dependent database
 +
    (b) alarms like end-of-run voice (Bob)
 +
    (c) feedback
 +
    (d) coil-pulsing aka modulation aka dithering (Victoria)
 +
    (e) panguin (GUI showing real-time plots)
 +
    (f) prompt analysis
 +
    (g) e-logbook entries
 +
    (h) archiving EPICs data
 +
Accomplished
 +
  * Revive all crates.
 +
  * Deploy all ADCs needed and test each channel.
 +
  * Build various DAQ configs with subsets of the DAQ crates.
 +
  * Timing diagram, check timing of external signals and readout.
 +
  * ET system upgrade, test rate limits, ensure deadtime zero.
 +
  * Implement Bank structure.
  
 
== Present ==
 
== Present ==

Revision as of 20:08, 15 January 2019

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

github repository: JAPAN

Agenda

  1. online plots pullRequest
  2. regression analysis
  3. DAQ issues
  4. VQWK adcs
  5. Other issues

Bob's DAQ tasklist

 TO-DO list for Parity DAQ
   updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13
Tao & Cameron: 8, 9
Bob: 3, 6, 10
Cip, Cameron, Tao: 13  
1 Timing: mostly understood, still small mysteries (LNE)
2 Synchronization-check system. w/help from Ed Jastrzembski
3 File naming, reset run num, finalize configs (INJ, CH, ALL) 
4 Fix scalers on spectrometer crates.
5 clean up cabling, labels, fasteners.
6 Clean up CRL -- eliminate so-called "dirty trick"
7 Check the 7200 scaler setup at injector, find a spare 7200.
8 Pedestal studies, aka cross-talk.  
9 Test JAPAN. Need cable map & labels. Possibly maintain "pan" ?
10 Green Monster maintenance.
11 Test spares.  Repair bad modules.
12 Document everything.  Circuit diagrams, cable map, "how to".
13 Online software, a bit undefined since software is changing.
    (a) automatic production of run-dependent database
    (b) alarms like end-of-run voice (Bob)
    (c) feedback
    (d) coil-pulsing aka modulation aka dithering (Victoria)
    (e) panguin (GUI showing real-time plots)
    (f) prompt analysis
    (g) e-logbook entries 
    (h) archiving EPICs data
Accomplished
 * Revive all crates.
 * Deploy all ADCs needed and test each channel.
 * Build various DAQ configs with subsets of the DAQ crates.
 * Timing diagram, check timing of external signals and readout.
 * ET system upgrade, test rate limits, ensure deadtime zero.
 * Implement Bank structure.

Present

Excused