Difference between revisions of "DAQ Commissioning Notes"

From PREX Wiki
Jump to navigationJump to search
Line 41: Line 41:
 
* [[DAQ_Testing/20190115|DAQ Testing - January 15th, 2019]] - Notes from January up to 15th, crate sync tests and scaler updates
 
* [[DAQ_Testing/20190115|DAQ Testing - January 15th, 2019]] - Notes from January up to 15th, crate sync tests and scaler updates
 
* [[DAQ_Testing/20190118|DAQ Testing - January 18th, 2019]] - Updating Japan to have the full detector map, and battery pedestal studies
 
* [[DAQ_Testing/20190118|DAQ Testing - January 18th, 2019]] - Updating Japan to have the full detector map, and battery pedestal studies
 +
* [[DAQ_Testing/20190122|DAQ Testing - January 22nd, 2019]] - Updating CH synch test to use JAPAN and vetoed logic modules
 +
* [[DAQ_Testing/20190123|DAQ Testing - January 23rd, 2019]] - BMW testing FLEXIO and testing Online JAPAN ET connection
  
  
 
[[Category:DAQ]]
 
[[Category:DAQ]]
 
[[Category:DAQ_Testing]]
 
[[Category:DAQ_Testing]]

Revision as of 16:14, 29 January 2019

Further information is available in DAQ Documentation Portal and DAQ Testing Portal, see also the Run List

Summer 2018 Resurrection

See the DAQ Meeting List, in particular May, June and July 2018 notes from Cameron and Chandan's visit with Bob, for details on efforts to resurrect the Parity DAQ system and run everything under Trigger Supervisor (TS) control.

Summer 2018 Recommissioning

Cameron and Chandan returned to JLab in late July 2018 to work with Bob on testing all ADC channels and other hardware and software, to ensure dynamic range and functionality, as well as updating things and maintaining usability for all interested parties.

Testing ADC Channels

See also - DAQ Layouts

Automating Testing/Analysis Software

See also - DAQ Software

Notes on specific module testing

See also - DAQ Hardware