Difference between revisions of "DAQ Testing/Run List"

From PREX Wiki
Jump to navigationJump to search
Line 116: Line 116:
 
!rowspan="1"| [[DAQ_Testing/20190123|January 23 2019]] || 1100-1104  
 
!rowspan="1"| [[DAQ_Testing/20190123|January 23 2019]] || 1100-1104  
 
| Testing JAPAN ET online connection and BMW FLEXIO functionality
 
| Testing JAPAN ET online connection and BMW FLEXIO functionality
 +
|-
 +
!rowspan="1"| February 1-3 2019 || 1105-1192
 +
| Injector studies
 +
|-
 +
!rowspan="1"| [[DAQ_Testing/20190204|February 04 2019]] || 1193
 +
| Testing CODA, JAPAN, PANGUIN, and compiled analysis scripts + SAM channel noise floors
 
|-
 
|-
 
|}
 
|}

Revision as of 22:20, 4 February 2019

Further DAQ Documentation is listed at the DAQ Documentation Portal and DAQ Testing links

Also see Testing and Commissioning Notes for a detailed description of tests.

DAQ Testing and Commissioning Run List

This is a compilation of runs taken during testing and commissioning of the DAQ before Prex/Crex

Summer 2018

Run list - Cameron and Chandan
Day Run Number Purpose
July 28 2018 4040-4067 Testing R HRS ADC Channels
July 29 2018 4068-4104 Testing L and R HRS ADC Channels
and Counting House channel debugging
July 30 2018 4107-4115 Fixed control.db, Counting House channel debug
4116-4121 Replaced bad vqwk ADCs in counting house crate

Fall 2018

Run list - Cameron, Ye, Bob
Day Run Number Purpose
October 23 2018 4444-4465 Cameron tests ET deatime
October 24 2018 4473-4501 Cameron tests ET deatime
October 29 2018 4503-4528 Cameron tests ET deatime
November 1 2018 4533-4542 Cameron and Ye check on cavity ADC signals
November 2 2018 4548-4554 Cameron tests ET deatime
November 5 2018 4556-4566 Cameron tests ET deatime
November 6 2018 4568 Cameron and Bob test injector timing
November 11 2018 Injector: Paul King adjusts FLEXIO timing
Injector: Caryn fixes control.db
November 14 2018 4611-4614 Injector: Cameron checks on SIS3801 timing
4615-4617 Counting House: Ye and Cameron test CntHouse ADCs again
November 21 2018 4631-4642 MCC High Current test HALOG
November 27 2018 4662-4680 Cameron tests Injector timing delays (4663 helicity benchmark)
December 2 2018 4685-4695 Cameron tests Injector timing delays (4686 helicity benchmark)
December 3 2018 4669-4700 Cameron tests CntHouse ET deadtime (4700 is a long benchmark run, no beam)
December 5 2018 4706-4742 Cameron tests CntHouse ET deadtime (4742 is a benchmark run, no beam)
December 17 2018 4776-4812 Cameron tests CntHouse ET deadtime, makes conclusions
December 19 2018 4813-4817 Cameron tests Banked CRL in injector timing, and BMW commissioning
December 21 2018 4818-4822 Cameron tests new RHRS scaler in PREX config, reads data, incorrectly

Spring 2019

There was a change of configs, now we have all Banked configs and reset the run number to 1000

Run list - Cameron, Ye, Bob, Tao
Day Run Number Purpose
January 15 2019 1017-1031 Cameron and Tao test synchronization monitor
January 18 2019 1032-1036 Cameron tests pedestals with 1.6 V battery in ADC channels
January 22 2019 1039-1044 and 1098 Testing synch monitor with new setup with Paul King
January 22 2019 Swing 1045-1097 Injector PQB Studies
January 23 2019 1100-1104 Testing JAPAN ET online connection and BMW FLEXIO functionality
February 1-3 2019 1105-1192 Injector studies
February 04 2019 1193 Testing CODA, JAPAN, PANGUIN, and compiled analysis scripts + SAM channel noise floors