Line 13: Line 13:
 
* Take pedestal noise floor calibration runs for updated SAM cabling configuration
 
* Take pedestal noise floor calibration runs for updated SAM cabling configuration
 
* Test BMW functionality with BSY connected to proper gate signal in CH NIM modules
 
* Test BMW functionality with BSY connected to proper gate signal in CH NIM modules
 +
* Testing SAMs with and without high voltage
  
 
== Restore Helicity Control Board in CH crate ==
 
== Restore Helicity Control Board in CH crate ==
  
 
== Establish Standard DAQ Procedure ==
 
== Establish Standard DAQ Procedure ==
 +
 +
== SAMs HV settings ==
 +
 +
[https://hallaweb.jlab.org/wiki/index.php/HV_HowTo_for_Experts HV settings information]
  
 
[[Category:DAQ_Testing]]
 
[[Category:DAQ_Testing]]

Revision as of 20:04, 5 February 2019

Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes

Previous Day of Testing << >> Next Day of Testing

February 5th, 2019 Testers: Cameron Clarke, Devi Adhikari, Ye Tian, Victoria Owen, Paul King

Goals

  • Restore Helicity Control Board in CH crate
  • Set up a second V2F module in the CH (from the 3rd spare in injector crate)
  • Send vqwk gate to HRSs (replace HEL signal with this CH HapTB GMN2 signal)
  • Take pedestal noise floor calibration runs for updated SAM cabling configuration
  • Test BMW functionality with BSY connected to proper gate signal in CH NIM modules
  • Testing SAMs with and without high voltage

Restore Helicity Control Board in CH crate

Establish Standard DAQ Procedure

SAMs HV settings

HV settings information