Difference between revisions of "DAQ Testing/20190205"
From PREX Wiki
Jump to navigationJump to searchLine 13: | Line 13: | ||
* Take pedestal noise floor calibration runs for updated SAM cabling configuration | * Take pedestal noise floor calibration runs for updated SAM cabling configuration | ||
* Test BMW functionality with BSY connected to proper gate signal in CH NIM modules | * Test BMW functionality with BSY connected to proper gate signal in CH NIM modules | ||
+ | * Testing SAMs with and without high voltage | ||
== Restore Helicity Control Board in CH crate == | == Restore Helicity Control Board in CH crate == | ||
== Establish Standard DAQ Procedure == | == Establish Standard DAQ Procedure == | ||
+ | |||
+ | == SAMs HV settings == | ||
+ | |||
+ | [https://hallaweb.jlab.org/wiki/index.php/HV_HowTo_for_Experts HV settings information] | ||
[[Category:DAQ_Testing]] | [[Category:DAQ_Testing]] |
Revision as of 20:04, 5 February 2019
Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes
Previous Day of Testing << >> Next Day of Testing
February 5th, 2019 Testers: Cameron Clarke, Devi Adhikari, Ye Tian, Victoria Owen, Paul King
Goals
- Restore Helicity Control Board in CH crate
- Set up a second V2F module in the CH (from the 3rd spare in injector crate)
- Send vqwk gate to HRSs (replace HEL signal with this CH HapTB GMN2 signal)
- Take pedestal noise floor calibration runs for updated SAM cabling configuration
- Test BMW functionality with BSY connected to proper gate signal in CH NIM modules
- Testing SAMs with and without high voltage