Difference between revisions of "Main Page"
From PREX Wiki
Jump to navigationJump to searchLine 25: | Line 25: | ||
<font color="Black"> | <font color="Black"> | ||
<UL> | <UL> | ||
− | <li> A [http://hallaweb.jlab.org/parity/prex/ | + | <li> A [http://hallaweb.jlab.org/parity/prex/shutdown.html shutdown work list] (updated Dec 2009) <font blue="red">Schedule is March 2010 !</font> |
</li> | </li> | ||
<li> An index of [http://hallaweb.jlab.org/experiment/HAPPEX/minutes.html Meeting Minutes and Talks] | <li> An index of [http://hallaweb.jlab.org/experiment/HAPPEX/minutes.html Meeting Minutes and Talks] |
Revision as of 14:49, 28 December 2009
PREX Wiki
The Lead Radius Experiment ("PREX"), experiment number E06002, uses the parity violating weak neutral interaction to probe the neutron distribution in a heavy nucleus, namely 208Pb, thus measuring the RMS neutron radius to 1% accuracy, which has an important impact on nuclear theory.
Spokespersons: Krishna Kumar (U. Mass), Paul Souder (Syracuse), Robert Michaels (JLab), Guido Urciuoli (INFN).
Physics Info
- 2005 Latest Proposal Update (Postscript), and Same, PDF.
- 2002 Earlier Proposal Update
- Original Proposal (Dec 1999).
- PREX Official Web Site (has more physics info)
Status and Plans
- A shutdown work list (updated Dec 2009) Schedule is March 2010 !
- An index of Meeting Minutes and Talks
- Working on a new Monte Carlo.
- Here are recent (Dec 5, 2007) diagrams of the 18-bit ADC and the somewhat older schematic from Fernando Barbosa.
- Here is Paul's note on slits for transverse asymmetry systematic (March, 2009).
- SEPTUM
- Here is a Test plan for Septum magnet to be done in Nov 2009 .
- Some drawings of the 5 degree septum courtesy M. Hodges. See also sept*.pdf in pics
- COLLIMATOR
- Overview of collimator to put in the mouth of Q1.
- Some specs for collimator to help engineer it.
- Possible way to stop 2-bounce photons
- The specification to taper the sides to reduce slit scattering.
- TARGET
- Oct 2009 Proposed target ladder:
- During the optics and calibration phase
- During the production mode
- Target info for the Jan 2008 test run.
- Here are Design Drawings from J. Miller. And here are assembly pics (was for the Jan 2008 test run)
- Early tests Pb target. See diagram of target and writeup about test (postscript) and same, PDF
- Oct 2009 Proposed target ladder:
- Polarimetry is crucial.
- Here is a specification for Moller FADC DAQ.
- In 2003 JLab held a Polarimetry Workshop
- There is an idea to use atomic hydrogen polarimetry.
- Here is a draft of plans to upgrade the Compton polarimeter.
- In Nov 2005 we had a 2 day run to test all aspects of the experiment at ~850 MeV. Results were explained in the 2005 propsal update (see talks, below).
Talks (including seminars and PAC Defenses)
- Here was the recent PREX workshop 2008 held at JLAB.
- Here are some talks about PREX at workshops, etc.
- An index of Collaboration Meetings and Weekly Meetings plus some older stuff.
Slides
- Here are some old transparencies.
External Links
Contributing to this PREX wiki
- To get a new account: click login.
- Where the page invites you to obtain an account click "request one" and follow the instructions.
- I'll get an e-mail, will approve you and you'll get a password by e-mail.
Consult the User's Guide for information on using the wiki software.
div class="right"><a href="">Top of page</a>
MediaWiki has been successfully installed.