Difference between revisions of "Target Operator"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
|||
Line 10: | Line 10: | ||
* Help the Shift Leader as needed | * Help the Shift Leader as needed | ||
+ | == CG list (ignore)== | ||
+ | * Start integrating mode runs (during production) | ||
+ | * Start Compton runs | ||
+ | ** Monitor Compton data | ||
+ | ** Monitor Compton background rates | ||
<B> Useful links </B> | <B> Useful links </B> |
Revision as of 21:09, 18 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Information for Shift Takers
Target Operator Responsibilities
- Operate the target ladder in conjunction with the run plan -> Moving the target
- Monitor the target system, paying close attention to the target sensors
- Make logbook posts of the target status, including sensor strip charts
- Help the Shift Leader as needed
CG list (ignore)
- Start integrating mode runs (during production)
- Start Compton runs
- Monitor Compton data
- Monitor Compton background rates
Useful links
- [pdf of Training Slides]