Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 125: | Line 125: | ||
|- | |- | ||
| Swing | | Swing | ||
− | | Optics | + | | Optics. |
| Vacuum issue. No beam for the whole shift. | | Vacuum issue. No beam for the whole shift. | ||
|- style="background: #FCF3CF; | |- style="background: #FCF3CF; | ||
Line 135: | Line 135: | ||
| Day | | Day | ||
| Optics. Send beam through Compton chicane. Compton commissioning. | | Optics. Send beam through Compton chicane. Compton commissioning. | ||
− | | | + | | Optics complete. Vacuum valve VBV1P03 (compton table) can't be open. MCC is tunning hall B. |
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Swing | | Swing | ||
− | | Low current cavity lock test. Q^2 on thin lead target (Bob or Kent). | + | | Low current cavity lock test. Q^2 on thin lead target (Bob or Kent). Opportunistic: SAM test. |
| | | | ||
|- | |- | ||
Line 155: | Line 155: | ||
|- | |- | ||
| rowspan="3" | Friday, June 28 | | rowspan="3" | Friday, June 28 | ||
+ | | Owl | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, June 29 | ||
+ | | Owl | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | Swing | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | rowspan="3" | Saturday, June 29 | ||
| Owl | | Owl | ||
| | | |
Revision as of 14:35, 26 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, June 17 | Owl | ||
Day | Last day for planned collaboration work in Hall. | Expecting 2A alignment | |
Swing | Vacuum connections between US pipe and target and between target and collimator box. | ||
Tuesday, June 18 | Owl | ||
Day | Pump down the entire pivot to dump region; Expecting 2B alignment | ||
Swing | Target software checks | ||
Wednesday, June 19 | Owl | ||
Day | Hall Closed. Final Checklist. Possible first beam in Hall A | ||
Swing | Continue beam in Hall A for tuning. Start low beam checkout. | ||
Thursday, June 20 | Owl | Continue low beam current checkout. | Completed Collimator search. |
Day | Tuning | ||
Swing | Tune up and Low current commissioning. | ||
Friday, June 21 | Owl | Low current commissioning. Started optics | Commissioned 45deg and 90deg targets. Calibrated ion chambers. Bullseye scan. |
Day | High current + Compton rate tuning. | ||
Swing | High current calibration after tuning (Caryn). Low current commissioning. Restart Optics (Seamus, Sanghwa, Ryan) | Basic run quality plot macro needed (Sanghwa). | |
Saturday, June 22 | Owl | Opportunistic: Beam Modulation (Paul K, Vectoria) | ESR 15K helium issue, scattering chamber vacuum degration investigation |
Day | Optics. | ||
Swing | Low current cavity (Ye, Cip). Minimum chase. | ||
Sunday, June 23 | Owl | Inner edge search (Bob, Chandan, Kent). Q2 measurement with Pb target (Bob?). Opportunistic: Beam Modulation (Paul K, Vectoria) | Inner edge search DONE. |
Day | Minimize width. | ||
Swing | Minimize width. Minimum chase. | ||
Monday, June 24 | Owl | Quartz align; quartz rate. (Dustin) | |
Day | Optics verification. | ESR 15K helium repair is ongoing. | |
Swing | No beam. | ||
Tuesday, June 25 | Owl | No beam. shift cancelled. | |
Day | Target cooling down. | shift cancelled | |
Swing | Optics. | Vacuum issue. No beam for the whole shift. | |
Wednesday, June 26 | Owl | Optics. | |
Day | Optics. Send beam through Compton chicane. Compton commissioning. | Optics complete. Vacuum valve VBV1P03 (compton table) can't be open. MCC is tunning hall B. | |
Swing | Low current cavity lock test. Q^2 on thin lead target (Bob or Kent). Opportunistic: SAM test. | ||
Thursday, June 27 | Owl | Detector alignment. Detector rate. | |
Day | Beam instrumentation calculation (Caryn) Production condition test (Caryn) | ||
Swing | Width Studies (KK) | ||
Friday, June 28 | Owl | ||
Day | |||
Swing | |||
Saturday, June 29 | Owl | ||
Day | |||
Swing | |||
Saturday, June 29 | Owl | ||
Day | |||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting