Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 38: Line 38:
 
| Low current cavity lock test. Optics.  Q^2 measurement (Bob or Kent). Opportunistic: SAM test.
 
| Low current cavity lock test. Optics.  Q^2 measurement (Bob or Kent). Opportunistic: SAM test.
 
| Cavity lock commissioning completed  
 
| Cavity lock commissioning completed  
|- style="background: #FCF3CF;
+
|-  
 
| rowspan="3" | Thursday, June 27
 
| rowspan="3" | Thursday, June 27
 
| Owl  
 
| Owl  
 
| Optics (db scan), Q2 measurement, detector alignment
 
| Optics (db scan), Q2 measurement, detector alignment
 
| db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon
 
| db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon
|-style="background: #FCF3CF;
+
|-
 
| Day  
 
| Day  
 
| Send beam through Compton chicane, Compton commissioning. (ongoing)   
 
| Send beam through Compton chicane, Compton commissioning. (ongoing)   
 
| Compton commissioning started at 1pm
 
| Compton commissioning started at 1pm
|-style="background: #FCF3CF;
+
|-
 
| Swing  
 
| Swing  
| Production condition test. Rate scan (Dustin) and width studies (KK).
+
| Production condition test. Rate scan (Dustin) and SAM shutter test, raster size verification
 
|
 
|
|-  
+
|- style="background: #FCF3CF;
 
| rowspan="3" | Friday, June 28
 
| rowspan="3" | Friday, June 28
 
| Owl  
 
| Owl  
|
+
| Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-()
 
|  
 
|  
|-
+
|- style="background: #FCF3CF;
 
| Day  
 
| Day  
 +
| Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning
 
|  
 
|  
|
+
|- style="background: #FCF3CF;
|-
 
 
| Swing  
 
| Swing  
|  
+
| Compton commissioning, current + PITA scan, finish up high current test, BMW
 
|
 
|
 
|-  
 
|-  

Revision as of 15:02, 28 June 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Tuesday, June 25 Owl No beam. shift cancelled.
Day Target cooling down. shift cancelled
Swing Optics. Vacuum issue. No beam for the whole shift.
Wednesday, June 26 Owl Optics.
Day Optics. Send beam through Compton chicane. Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened.
Swing Low current cavity lock test. Optics. Q^2 measurement (Bob or Kent). Opportunistic: SAM test. Cavity lock commissioning completed
Thursday, June 27 Owl Optics (db scan), Q2 measurement, detector alignment db scan, Q2 data taking completed in the morning, detector adjustment needs hall access in the afteroon
Day Send beam through Compton chicane, Compton commissioning. (ongoing) Compton commissioning started at 1pm
Swing Production condition test. Rate scan (Dustin) and SAM shutter test, raster size verification
Friday, June 28 Owl Controlled access (SAM shutter removed, detectors to integrating mode), high current test (no FFB ;-()
Day Mostly down due to vacuum problem, shift BMW test with tune beam, Compton commissioning
Swing Compton commissioning, current + PITA scan, finish up high current test, BMW
Saturday, June 29 Owl
Day
Swing
Sunday, June 30 Owl
Day Moller commissioning.
Swing

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting