Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
|-
 
| rowspan="3" | Monday, July 8
 
|Owl
 
| no beam
 
|
 
|-
 
|Day
 
|High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 
|Production CW ,
 
|-
 
|Swing
 
|High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 
|Production CW
 
|-
 
| rowspan="3" | Tuesday, July 9
 
|Owl
 
| High current Pb, Carbon 1%, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 
| Parasitic CW ,  tuning for higher passes
 
|-
 
|Day
 
| Low current, different triggers on C, Pb
 
| Parasitic CW ,  tuning for higher passes
 
|-
 
|Swing
 
|Low current GEMS,Sieve/switch to integrating (and remove S0?)
 
|Parasitic CW ,  tuning for higher passes
 
|-
 
| rowspan="3" | Wednesday, July 10
 
|Owl
 
| Detector alignment and low current counting mode
 
|CW low current
 
|-
 
| Day
 
| High current Isotopic Lead,set HVs, BMW, current scan, PITA/IA scan [[PowerDownRestartHiLumPlan | Detailed plan]]
 
| 50uA
 
|-
 
| Swing
 
| Moller commissioning
 
| <2uA
 
|-
 
| rowspan="3" | Thursday, July 11
 
|Owl
 
|Finish Moller commissioning, 50uA production runs isotopic lead (BMW, Aq feedabck, FFB on)
 
|Experts are looking at data, FFB was not working
 
|-
 
| Day
 
| Hysteresis recovery, machine retuning
 
| Hysteresis recovery done, no beam in the hall.
 
|-
 
| Swing
 
| No beam in the hall
 
|
 
|-
 
| rowspan="3" | Friday, July 12
 
|Owl
 
|Planned to 208Pb production and understand noise problem (Cip). Call Paul King+ Cameron for raster sync studies 
 
|No beam in the hall
 
|-
 
| Day
 
| Expecting beam around noon. After beam comes, try for FFB. If it doesn't work within 30min, go to 208Pb production data and understand noise problem (call Ciprian)
 
| No beam in the hall
 
|-
 
| Swing
 
| Try FFB and 208Pb production.
 
| No beam in the hall
 
|-
 
| rowspan="3" | Saturday, July 13
 
|Owl
 
|Ask MCC to tune 65 uA to dump and then ask them to try fast feedback. Give them ~30 min for FFB. Planned to 208Pb production and understand noise problem (call Ciprian). 
 
| no beam in the hall
 
|-
 
| Day
 
| Continue with owl shift plan.
 
| No beam
 
|-
 
| Swing
 
| Continue with today's owl shift plan
 
| got beam ~8 pm. Checked raster size and started production data taking without FFB
 
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;

Revision as of 23:17, 13 July 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Sunday, July 14 Owl Production+ analysis. FFB (30 min), BMW (30 min), Aq
Day
Swing

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting