Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
|-
 
| rowspan="3" | Tuesday, July 16
 
|Owl
 
|MOLLER Polarimeter and FFB commissioning 
 
|
 
|-
 
| Day
 
| production after pass change
 
|
 
|-
 
| Swing
 
|change IHWP ('out'), BPM and BCM calibration (Caryn)
 
|Done
 
|-
 
| rowspan="3" | Wednesday, July 17
 
|Owl
 
|Production with 50uA with Aq, BMW and Energy-mode:'RF-off' 
 
|
 
|-
 
| Day
 
| HallB tuning no beam and frame hunting I
 
|
 
|-
 
| Swing
 
|frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster
 
|
 
|-
 
| rowspan="3" | Thursday, July 18
 
|Owl
 
|IA, PITA scan, 50uA production with with Aq (HallA and C), BMW and FFB off 
 
|
 
|-
 
| Day
 
| 50 microAmp production, PQB study, FFB test
 
| full survey to solve the RHRS Q2 
 
|-
 
| Swing
 
|Moller measurement
 
|
 
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;

Revision as of 08:36, 21 July 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Friday, July 19 Owl Moller measurement ready for the spin dance, may need short measurement to be complete.
Day control access for the RHRS Q2 magnet tripping
Swing Bandwidth, BCM, FFB, Left arm only production at 50uA

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting