Difference between revisions of "WAC Notes July 21 2019"

From PREX Wiki
Jump to navigationJump to search
Line 27: Line 27:
  
 
=== Production Run List Swing 2019-07-20/ Owl 21 ===
 
=== Production Run List Swing 2019-07-20/ Owl 21 ===
* Start Slug 9 on 3520, junk until 3522
+
* Start [https://hallaweb.jlab.org/parity/prex/onlinePlots/slug/slug_list/slug9-Left/y_postPanPlots_slug9-Left.pdf Slug 9] on 3520, junk until 3522
 
* Calibration - [3523]: Aggressive Aq scan
 
* Calibration - [3523]: Aggressive Aq scan
 
* Calibration/Needs Cuts - [3524]: IA scan
 
* Calibration/Needs Cuts - [3524]: IA scan
Line 34: Line 34:
  
 
=== Production Run List Owl 2019-07-21 ===
 
=== Production Run List Owl 2019-07-21 ===
* Start Slug 10 on 3542, junk 3542
+
* Start [https://hallaweb.jlab.org/parity/prex/onlinePlots/slug/slug_list/slug10-Left/y_postPanPlots_slug10-Left.pdf Slug 10] on 3542, junk 3542
 
* - [3544]: [https://logbooks.jlab.org/entry/3707685 BPM saturation]
 
* - [3544]: [https://logbooks.jlab.org/entry/3707685 BPM saturation]
 
* Production - [3545]: [https://logbooks.jlab.org/entry/3707687 BPM saturation resolved]
 
* Production - [3545]: [https://logbooks.jlab.org/entry/3707687 BPM saturation resolved]

Revision as of 20:01, 21 July 2019

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << Instructions

WAC Notes July 20 2019 << >> WAC Notes July 22 2019

July 21 2019

Slug 9/10

  • No Right Arm
  • Changed to an_ds1 normalizing BCM
  • Still working on pedestals
  • S0 Out
  • IHWP Out 9 - 3520-3541
  • IHWP In 10 - 3542-35-

Production Run List Swing 2019-07-20/ Owl 21

Production Run List Owl 2019-07-21

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

  • Need to update the other BCMs with prior 50 uA pedestals from Caryn

Issues

Other Status Updates