Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 12: | Line 12: | ||
|- | |- | ||
! style="width:10%"| Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status | ! style="width:10%"| Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status | ||
+ | |-style="background: #FCF3CF; | ||
+ | | rowspan="3" | Wednesday, July 24 | ||
+ | |Owl | ||
+ | |No acceptable beam until 6:30am | ||
+ | |Dump puck | ||
+ | |- | ||
+ | |-style="background: #FCF3CF; | ||
+ | | Day | ||
+ | |Moller and Spin dance measurement | ||
+ | | | ||
+ | |- | ||
+ | |-style="background: #FCF3CF; | ||
+ | | Swing | ||
+ | | Qsq measurement, Detector alignment at low current, and current scan, PITA scan, SAM HV adjustment, and production at 70uA | ||
+ | | short access for changing the cable to integrate mode and changing the Compton attenuator? | ||
+ | |- | ||
|- | |- | ||
| rowspan="3" | Sunday, July 21 | | rowspan="3" | Sunday, July 21 | ||
Line 53: | Line 69: | ||
| No acceptable beam | | No acceptable beam | ||
|1H04E had trouble locking, ion chamber and Compton high rates, Faraday cup2 | |1H04E had trouble locking, ion chamber and Compton high rates, Faraday cup2 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} |
Revision as of 16:18, 24 July 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Wednesday, July 24 | Owl | No acceptable beam until 6:30am | Dump puck |
Day | Moller and Spin dance measurement | ||
Swing | Qsq measurement, Detector alignment at low current, and current scan, PITA scan, SAM HV adjustment, and production at 70uA | short access for changing the cable to integrate mode and changing the Compton attenuator? | |
Sunday, July 21 | Owl | production at 50uA | RHRS Q2 magnet is down |
Day | production at 50uA | RHRS Q2 magnet is down | |
Swing | Qsqr measurement and production at 50uA | RHRS Q2 magnet is down | |
Monday, July 22 | Owl | production at 50uA, Moller measurement was paused | LCW leak in the west arc |
Day | control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode | LCW leak >10 hours | |
Swing | Qsq measurement, Detector alignment at low current. | 1 hour | |
Tuesday, July 23 | Owl | No beam due to LCW leak | >30h |
Day | control access for Q2 magnet, Compton laser work | Q2 is recovered around 12:00pm | |
Swing | No acceptable beam | 1H04E had trouble locking, ion chamber and Compton high rates, Faraday cup2 |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting