Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 29: Line 29:
 
|-
 
|-
 
|-
 
|-
| rowspan="3" | Sunday, July 21
+
| rowspan="3" | Thursday, July 25
 
|Owl
 
|Owl
|production at 50uA
+
|production at 70uA
|RHRS Q2 magnet is down
+
|
 
|-
 
|-
 
| Day
 
| Day
|production at 50uA
+
|production at 70uA
| RHRS Q2 magnet is down
+
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Qsqr measurement and production at 50uA
+
| production at 70uA
| RHRS Q2 magnet is down
+
|  
 
|-
 
|-
|-
+
| rowspan="3" | Monday, July 26
| rowspan="3" | Monday, July 22
 
 
|Owl
 
|Owl
|production at 50uA, Moller measurement was paused 
+
|production at 70uA
|LCW leak in the west arc
+
|
 
|-
 
|-
 
| Day
 
| Day
|control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode 
+
|production at 70uA
|LCW leak >10 hours
+
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Qsq measurement, Detector alignment at low current. 
+
| production at 70uA
|1 hour
+
|  
|-
 
 
|-
 
|-
| rowspan="3" | Tuesday, July 23
+
| rowspan="3" | Tuesday, July 27
 
|Owl
 
|Owl
|No beam due to LCW leak 
+
|production at 70uA
|>30h
+
|
 
|-
 
|-
 
| Day
 
| Day
|control access for Q2 magnet, Compton laser work 
+
|production at 70uA
|Q2 is recovered around 12:00pm
+
|  
 
|-
 
|-
 
| Swing
 
| Swing
| No acceptable beam
+
| production at 70uA
|1H04E had trouble locking, ion chamber and Compton high rates,  Faraday cup2 
+
|  
 
|-
 
|-
 
|}
 
|}

Revision as of 16:20, 24 July 2019



PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wednesday, July 24 Owl No acceptable beam until 6:30am Dump puck
Day Moller and Spin dance measurement
Swing Qsq measurement, Detector alignment at low current, and current scan, PITA scan, SAM HV adjustment, and production at 70uA short access for changing the cable to integrate mode and changing the Compton attenuator?
Thursday, July 25 Owl production at 70uA
Day production at 70uA
Swing production at 70uA
Monday, July 26 Owl production at 70uA
Day production at 70uA
Swing production at 70uA
Tuesday, July 27 Owl production at 70uA
Day production at 70uA
Swing production at 70uA

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting