Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 25: | Line 25: | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Swing | | Swing | ||
− | | | + | | Low current: detector alignment (Devi, Kent, Dustin), Qsq measurement (Bob); Short access to go to integrating mode (Devi); SAM HV adjustment (Devi); Current scan - 5 - 75 uA, PITA scan (Caryn), 30 minute PROD run at 50uA and production at 70uA |
− | | short access for changing the cable to integrate mode and changing the Compton attenuator | + | | short access for changing the cable to integrate mode and changing the Compton attenuator |
|- | |- | ||
| rowspan="3" | Thursday, July 25 | | rowspan="3" | Thursday, July 25 |
Revision as of 16:30, 24 July 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Wednesday, July 24 | Owl | No acceptable beam until 6:30am | Dump puck |
Day | Moller and Spin dance measurement | ||
Swing | Low current: detector alignment (Devi, Kent, Dustin), Qsq measurement (Bob); Short access to go to integrating mode (Devi); SAM HV adjustment (Devi); Current scan - 5 - 75 uA, PITA scan (Caryn), 30 minute PROD run at 50uA and production at 70uA | short access for changing the cable to integrate mode and changing the Compton attenuator | |
Thursday, July 25 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Friday, July 26 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Saturday, July 27 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Sunday, July 28 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Monday, July 29 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Tuesday, July 30 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Wednesday, July 31 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting