Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 25: | Line 25: | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Swing | | Swing | ||
− | | # Low current: detector alignment (Devi, Kent, Dustin) | + | | |
− | # Qsq measurement (Bob) | + | # Low current: detector alignment (Devi, Kent, Dustin) |
+ | # Qsq measurement (Bob) | ||
+ | # Short access to go to integrating mode (Devi) | ||
+ | # [[Beam Recovery#Procedure for Long Beam Down|Beam recovery procedure ]] | ||
+ | # SAM HV adjustment (Devi) | ||
+ | # Current scan (75 - 5 uA), PITA scan (Caryn) | ||
+ | # 30 minute PROD run at 50uA | ||
+ | # Production at 70uA | ||
| short access for changing the cable to integrate mode and changing the Compton attenuator | | short access for changing the cable to integrate mode and changing the Compton attenuator | ||
|- | |- |
Revision as of 16:34, 24 July 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Wednesday, July 24 | Owl | No acceptable beam until 6:30am | Dump puck |
Day | Moller and Spin dance measurement | ||
Swing |
|
short access for changing the cable to integrate mode and changing the Compton attenuator | |
Thursday, July 25 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Friday, July 26 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Saturday, July 27 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Sunday, July 28 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Monday, July 29 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Tuesday, July 30 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Wednesday, July 31 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting