Difference between revisions of "WAC Notes July 25 2019"

From PREX Wiki
Jump to navigationJump to search
Line 40: Line 40:
  
 
* Increase in Detector widths and Collimator temperature [https://logbooks.jlab.org/entry/3710103 HALOG] [https://logbooks.jlab.org/entry/3709953 COLLIMATOR] [https://logbooks.jlab.org/entry/3710033 HALOG]
 
* Increase in Detector widths and Collimator temperature [https://logbooks.jlab.org/entry/3710103 HALOG] [https://logbooks.jlab.org/entry/3709953 COLLIMATOR] [https://logbooks.jlab.org/entry/3710033 HALOG]
 +
* Increase in collimator temperature and raising neutron dose [https://logbooks.jlab.org/entry/3710012 HALOG]
 +
* The increase in detector widths started from late Swing Shift [https://logbooks.jlab.org/entry/3710003 HALOG]
 
* Cavity BPM lock change [https://logbooks.jlab.org/entry/3710086 HALOG]
 
* Cavity BPM lock change [https://logbooks.jlab.org/entry/3710086 HALOG]
  

Revision as of 08:11, 26 July 2019

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes July 24 2019 << >> WAC Notes July 26 2019

July 25 2019

Production Run List

Start Slug 13, IHWP OUT Flip Right, FFB on always

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • There were many pedestal and event cut problems. From now on, when an event cut isn't absolutely necessary it should be removed - see japan source code for reference of cuts here
  • The BCM appears to be falling apart. We are fixing it and running slug 12 on BCM DG DS in the meantime.
  • BPM 4ec had intermittant problems (iocse10 has issues) and so we are regressing with 4e again. BPM 11X is ok and stays in regression.


  • Increase in Detector widths and Collimator temperature HALOG COLLIMATOR HALOG
  • Increase in collimator temperature and raising neutron dose HALOG
  • The increase in detector widths started from late Swing Shift HALOG
  • Cavity BPM lock change HALOG

Other Status Updates