Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 33: | Line 33: | ||
# production at 70uA | # production at 70uA | ||
| | | | ||
− | |- | + | |-style="background: #FCF3CF; |
| rowspan="3" | Friday, July 26 | | rowspan="3" | Friday, July 26 | ||
|Owl | |Owl | ||
Line 50: | Line 50: | ||
| production at 70uA | | production at 70uA | ||
| | | | ||
− | |- | + | |- |
| rowspan="3" | Saturday, July 27 | | rowspan="3" | Saturday, July 27 | ||
|Owl | |Owl |
Revision as of 08:50, 26 July 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Thursday, July 25 | Owl | production at 70uA | |
Day |
|
BPMs fixed, bias left on after study; analog BCM problem from Hall and not fixed; plan is to use digital BCMs with separate receivers | |
Swing |
|
||
Friday, July 26 | Owl | production at 70uA | deltaT on the collimator increased. Water out temp exceeding our set limits |
Day |
|
||
Swing | production at 70uA | ||
Saturday, July 27 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Sunday, July 28 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Monday, July 29 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Tuesday, July 30 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA | ||
Wednesday, July 31 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting