Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 33: Line 33:
 
# production at 70uA
 
# production at 70uA
 
|  
 
|  
|-style="background: #FCF3CF;
+
|-
 
| rowspan="3" | Friday, July 26
 
| rowspan="3" | Friday, July 26
 
|Owl
 
|Owl
 
|production at 70uA
 
|production at 70uA
 
| deltaT on the collimator increased.  Water out temp exceeding our set limits
 
| deltaT on the collimator increased.  Water out temp exceeding our set limits
|-style="background: #FCF3CF;
+
|-
 
| Day
 
| Day
 
|
 
|
Line 45: Line 45:
 
# Some beam tuning to look at reducing the trip rate (could that be related to the collimator temps?)
 
# Some beam tuning to look at reducing the trip rate (could that be related to the collimator temps?)
 
| receiver swapped; DO NOT MOVED THE TARGET!
 
| receiver swapped; DO NOT MOVED THE TARGET!
|-style="background: #FCF3CF;
+
|-
 
| Swing
 
| Swing
 
|  
 
|  
Line 52: Line 52:
 
# careful collimator temperature study (Kent)
 
# careful collimator temperature study (Kent)
 
|  
 
|  
|-
+
|-style="background: #FCF3CF;
 
| rowspan="3" | Saturday, July 27
 
| rowspan="3" | Saturday, July 27
 
|Owl
 
|Owl
 
|production at 70uA
 
|production at 70uA
 
|
 
|
|-
+
|-style="background: #FCF3CF;
 
| Day
 
| Day
 
|production at 70uA
 
|production at 70uA
 
|  
 
|  
|-
+
|-style="background: #FCF3CF;
 
| Swing
 
| Swing
 
| production at 70uA
 
| production at 70uA

Revision as of 10:59, 27 July 2019



PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Thursday, July 25 Owl production at 70uA
Day
  1. Planned:
    • production at 70uA
    • ~30 minutes for injector bias tests during Hall C gas work (Caryn)
  2. Unplanned:
    • Access to fix the BPMs/ move away from beamline (Francis)
    • Need to fix the BCMs (Musson)
BPMs fixed, bias left on after study; analog BCM problem from Hall and not fixed; plan is to use digital BCMs with separate receivers
Swing
  1. Beam recovery procedure
  2. production at 70uA
Friday, July 26 Owl production at 70uA deltaT on the collimator increased. Water out temp exceeding our set limits
Day
  1. production at 70uA
  2. Brief access to swap the digital receiver when Musson and Co. ready
  3. Some beam tuning to look at reducing the trip rate (could that be related to the collimator temps?)
receiver swapped; DO NOT MOVED THE TARGET!
Swing
  1. production at 70uA
  2. special spot run with VDCs (Kent)
  3. careful collimator temperature study (Kent)
Saturday, July 27 Owl production at 70uA
Day production at 70uA
Swing production at 70uA
Sunday, July 28 Owl production at 70uA
Day production at 70uA
Swing production at 70uA
Monday, July 29 Owl production at 70uA
Day low current running beginning at 8am (if approved)
Swing low current running beginning at 8am (if approved)
Tuesday, July 30 Owl low current running beginning at 8am (if approved)
Day Target fix
Swing production at 70uA
Wednesday, July 31 Owl production at 70uA
Day production at 70uA
Swing production at 70uA

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting