Difference between revisions of "Analysis Expert"

From PREX Wiki
Jump to navigationJump to search
Line 30: Line 30:
 
#* Each slug should have ~8 runs, but the real measure is a total charge of at least 1.2 C (but not too much more than this)
 
#* Each slug should have ~8 runs, but the real measure is a total charge of at least 1.2 C (but not too much more than this)
 
#* Keep track of the accumulated charge in the slug using the [[PVDB#Accumulated_charge_monitor | counter]]
 
#* Keep track of the accumulated charge in the slug using the [[PVDB#Accumulated_charge_monitor | counter]]
##* If the current run had steady beam and no known issues, check the accumulated charge before it ends
+
#** If the current run had steady beam and no known issues, check the accumulated charge before it ends
 
##* If the accumulated charge is >1.3 C including all runs but the current run, and the current run is good, you can probably increment the slug
 
##* If the accumulated charge is >1.3 C including all runs but the current run, and the current run is good, you can probably increment the slug
 
##* Ask the shift leader to follow the instructions at [[Flipper]]
 
##* Ask the shift leader to follow the instructions at [[Flipper]]

Revision as of 18:06, 27 July 2019

Quick Links
HOW TOs
CODA
WAC Tools
Online analysis How-To



PREX Main << Information for Shift Takers


Analysis Expert Tasks

  1. Assist shift crew in data taking as needed
    • help diagnose and solve CODA issues
    • answer questions about plots in Panguin
  2. Makes sure online analysis is up to date
  3. Look at beam quality
    • Look at runs from a previous good period and compare to the current runs
    • Watch for changes in means and widths over time
    • Log anything that you think is an issue that needs to be investigated and email the WAC
  4. Decide when to change IHWP settings
    • Each slug should have ~8 runs, but the real measure is a total charge of at least 1.2 C (but not too much more than this)
    • Keep track of the accumulated charge in the slug using the counter
      • If the current run had steady beam and no known issues, check the accumulated charge before it ends
      • If the accumulated charge is >1.3 C including all runs but the current run, and the current run is good, you can probably increment the slug
      • Ask the shift leader to follow the instructions at Flipper