Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 70: | Line 70: | ||
| Production running at 70uA | | Production running at 70uA | ||
| | | | ||
− | |- | + | |- |
| rowspan="3" | Friday, August 2 | | rowspan="3" | Friday, August 2 | ||
|Owl | |Owl | ||
| Production running at 70uA | | Production running at 70uA | ||
| | | | ||
− | |- | + | |- |
| Day | | Day | ||
| | | | ||
# Wien flip starting at 8:30am | # Wien flip starting at 8:30am | ||
# Compton work in the hall: lens, mode-matching, PPLN tuning | # Compton work in the hall: lens, mode-matching, PPLN tuning | ||
− | #Production 70uA (IHWP OUT, start slug 26) | + | #Production 70uA; (IHWP OUT, start slug 26) |
− | | | + | |raster changed to 4 x 5 mm2 for slug 26 |
− | |- | + | |- |
| Swing | | Swing | ||
|Production running at 70uA | |Production running at 70uA | ||
| | | | ||
− | |- | + | |-style="background: #FCF3CF; |
| rowspan="3" | Saturday, August 3 | | rowspan="3" | Saturday, August 3 | ||
| Owl | | Owl | ||
| Production running at 70uA | | Production running at 70uA | ||
| | | | ||
− | |- | + | |-style="background: #FCF3CF; |
| Day | | Day | ||
+ | # Address issues: Col. temps, and increased det. widths | ||
|Production running at 70uA | |Production running at 70uA | ||
| | | | ||
− | |- | + | |-style="background: #FCF3CF; |
| Swing | | Swing | ||
| Production running at 70uA | | Production running at 70uA |
Revision as of 14:08, 3 August 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Tuesday, July 30 | Owl | low current running beginning at 8am (if approved) | |
Day | Target fix | ||
Swing |
|
||
Wednesday, July 31 | Owl | production at 70uA | |
Day |
|
| |
Swing |
|
||
Thursday, August 1 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | Production running at 70uA | ||
Friday, August 2 | Owl | Production running at 70uA | |
Day |
|
raster changed to 4 x 5 mm2 for slug 26 | |
Swing | Production running at 70uA | ||
Saturday, August 3 | Owl | Production running at 70uA | |
Day
|
Production running at 70uA | ||
Swing | Production running at 70uA | ||
Sunday, August 4 | Owl | Production running at 70uA | |
Day | MOLLER starting at 8am | ||
Swing | Production running at 70uA | ||
Monday, August 5 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Tuesday, August 6 | Owl | Production running at 70uA | |
Day | Beam Studies | ||
Swing | Production running at 70uA | ||
Wednesday, August 7 | Owl | Production running at 70uA | |
Day | Production running at 70uA | Possible time for transverse beam polarization measurements | |
Swing | Production running at 70uA |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting