Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 51: | Line 51: | ||
| | | | ||
# Production running at 70uA | # Production running at 70uA | ||
− | # Compton Chicane tuning; | + | # Compton Chicane tuning; |
| | | | ||
|- | |- | ||
Line 68: | Line 68: | ||
# No beam during Hall C witness beam setup and injector anode-bias remove | # No beam during Hall C witness beam setup and injector anode-bias remove | ||
# Production running at 70uA | # Production running at 70uA | ||
+ | # <s>Moller solenoid axis and lock</s> | ||
| | | | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; |
Revision as of 11:36, 8 August 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, August 5 | Owl | more Moller | |
Day |
|
||
Swing | Production running at 70uA | ||
Tuesday, August 6 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Wednesday, August 7 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Thursday, August 8 | Owl | Production running at 70uA | |
Day | Production running at 70uA
|
||
Swing | Production running at 70uA | ||
Friday, August 9 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Saturday, August 10 | Owl | Production running at 70uA | |
Day |
|
||
Swing | Production running at 70uA | ||
Sunday, August 11 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting