Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 127: Line 127:
 
| Swing
 
| Swing
 
| Production running at 70uA
 
| Production running at 70uA
|-style="background: #FCF3CF;
+
|-
 
| rowspan="3" | Monday, August 12
 
| rowspan="3" | Monday, August 12
 
| Owl
 
| Owl
 
| Production running at 70uA with  
 
| Production running at 70uA with  
 
|  
 
|  
|-style="background: #FCF3CF;
+
|-
 
| Day
 
| Day
 
|  
 
|  
Line 138: Line 138:
 
# Commissioning targets required for Transverse measurements include raster size calibrations
 
# Commissioning targets required for Transverse measurements include raster size calibrations
 
|  
 
|  
|-style="background: #FCF3CF;
+
|-
 
| Swing
 
| Swing
 
| Production running at 70uA
 
| Production running at 70uA
|-
+
|-style="background: #FCF3CF;
 
| rowspan="3" | Tuesday, August 13
 
| rowspan="3" | Tuesday, August 13
 
| Owl
 
| Owl
 
| Production running at 70uA
 
| Production running at 70uA
 
|  
 
|  
|-
+
|-style="background: #FCF3CF;
 
| Day
 
| Day
 
|  
 
|  
Line 152: Line 152:
 
# Preparations for Transverse Polarized Measurement
 
# Preparations for Transverse Polarized Measurement
 
|  
 
|  
|-
+
|-style="background: #FCF3CF;
 
| Swing
 
| Swing
 
| Transverse Polarized Measurement
 
| Transverse Polarized Measurement

Revision as of 21:50, 12 August 2019



PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Monday, August 5 Owl more Moller
Day
  1. Compton work in Hall
  2. Production running at 70uA
Swing Production running at 70uA
Tuesday, August 6 Owl Production running at 70uA
Day
  1. Production until 10:30 am
  2. Controlled access for Compton work
Swing Production running at 70uA
Wednesday, August 7 Owl Production running at 70uA
Day
  1. Production running at 70uA
  2. Compton Chicane tuning;
Swing Production running at 70uA
Thursday, August 8 Owl Production running at 70uA
Day
  1. Production running at 70uA
  2. Production until 9:00 am
  3. No beam during Hall C witness beam setup and injector anode-bias remove
  4. Production running at 70uA
  5. Moller solenoid axis and lock
Swing Production running at 70uA
Friday, August 9 Owl Production running at 70uA
Day
  1. Production running at 70uA
  2. Hall Access
  3. Production running at 70uA
Swing Production running at 70uA
Saturday, August 10 Owl
  1. Production running at 70uA until 6:30 am
  2. Ask to save the Compton-Chicane tune configuration
  3. Request for Compton Straight-Through beam
  4. Take production at 70 uA until Moller crew arive
Day
  1. Moller measurement
  2. Production running at 70uA
Swing
  1. Moller measurement
  2. Production running at 70uA
Sunday, August 11 Owl
  1. Request Compton Straight-Through tune
  2. Production running at 70uA with Compton Straight-Through beam
Day
  1. Production running at 70uA
Swing Production running at 70uA
Monday, August 12 Owl Production running at 70uA with
Day
  1. Production running at 70uA
  2. Commissioning targets required for Transverse measurements include raster size calibrations
Swing Production running at 70uA
Tuesday, August 13 Owl Production running at 70uA
Day
  1. Planned accelerator downtime:Beam studies
  2. Preparations for Transverse Polarized Measurement
Swing Transverse Polarized Measurement
Wednesday, August 14 Owl Transverse Polarized Measurement
Day
  1. Transverse Polarized Measurement
  2. Wein Flip back to `Right'
Swing Production running at 70uA

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting