Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
(Archive previous week, add current info.)
Line 13: Line 13:
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
|-
 
|-
| rowspan="3" | Monday, August 5
+
| rowspan="3" | Monday, August 12
 
| Owl
 
| Owl
| more Moller
+
| Production running at 70uA with
|
+
|  
 
|-
 
|-
 
| Day
 
| Day
|
 
# Compton work in Hall
 
#Production running at 70uA
 
 
|  
 
|  
|-
+
# Production running at 70uA
| Swing
+
# Commissioning targets required for Transverse measurements include raster size calibrations
| Production running at 70uA
 
|
 
|-
 
| rowspan="3" | Tuesday, August 6
 
| Owl
 
| Production running at 70uA
 
|
 
|-
 
| Day
 
|
 
# Production until 10:30 am
 
#Controlled access for Compton work
 
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
 
| Production running at 70uA
 
| Production running at 70uA
|
 
 
|-
 
|-
| rowspan="3" | Wednesday, August 7
+
| rowspan="3" | Tuesday, August 13
 
| Owl
 
| Owl
 
| Production running at 70uA
 
| Production running at 70uA
Line 49: Line 33:
 
|-
 
|-
 
| Day
 
| Day
|
 
# Production running at 70uA
 
# Compton Chicane tuning;
 
 
|  
 
|  
 +
# Planned accelerator downtime:Beam studies
 +
# Preparations for Transverse Polarized Measurement
 
|-
 
|-
 
| Swing
 
| Swing
| Production running at 70uA
+
| Transverse Polarized Measurement
 
|  
 
|  
|-
+
|-style="background: #FCF3CF;
| rowspan="3" | Thursday, August 8
+
| rowspan="3" | Wednesday, August 14
 
| Owl
 
| Owl
| Production running at 70uA
+
| Transverse Polarized Measurement
 
|  
 
|  
|-
+
|-style="background: #FCF3CF;
 
| Day
 
| Day
 
|  
 
|  
#Production running at 70uA
+
# Transverse Polarized Measurement
# Production until 9:00 am
+
# Wein Flip back to `Right'
# No beam during Hall C witness beam setup and injector anode-bias remove
+
|
# Production  running at 70uA
+
# Transverse work done at ~10:30.
# <s>Moller solenoid axis and lock</s>
+
# Hand things off to OPS for beam studies and Wien flip.
|
+
|-style="background: #FCF3CF;
|-
 
 
| Swing
 
| Swing
 +
# Establish PQB after Wien flip
 +
# PITA scan
 
| Production running at 70uA
 
| Production running at 70uA
|  
+
|
 +
# Caryn checks PQB (at ILD). Done by ~16:30
 
|-
 
|-
| rowspan="3" | Friday, August 9
+
| rowspan="3" | Thursday, August 15
 
| Owl
 
| Owl
 
| Production running at 70uA
 
| Production running at 70uA
Line 82: Line 67:
 
|-
 
|-
 
| Day
 
| Day
|  
+
| Production running at 70uA
# Production running at 70uA
 
# Hall Access
 
# Production running at 70uA
 
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
 
| Production running at 70uA
 
| Production running at 70uA
|  
+
|
 
|-
 
|-
| rowspan="3" | Saturday, August 10
+
| rowspan="3" | Friday, August 16
 
| Owl
 
| Owl
 
|  
 
|  
# Production running at 70uA until 6:30 am
 
# Ask to save the Compton-Chicane tune configuration
 
# Request for Compton Straight-Through beam
 
# Take production at 70 uA until Moller crew arive
 
 
|  
 
|  
 
|-
 
|-
 
| Day
 
| Day
 
|  
 
|  
# Moller measurement
 
# Production running at 70uA
 
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
 
|  
 
|  
# Moller measurement
+
|
# <s>Production running at 70uA</s>
 
|  
 
 
|-
 
|-
| rowspan="3" | Sunday, August 11
+
| rowspan="3" | Saturday, August 17
 
| Owl
 
| Owl
 
|  
 
|  
# Request Compton Straight-Through tune
 
# Production running at 70uA with Compton Straight-Through beam
 
 
|  
 
|  
 
|-
 
|-
 
| Day
 
| Day
 
|  
 
|  
# Production running at 70uA
 
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Production running at 70uA
 
|-
 
| rowspan="3" | Monday, August 12
 
| Owl
 
| Production running at 70uA with
 
|
 
|-
 
| Day
 
|
 
# Production running at 70uA
 
# Commissioning targets required for Transverse measurements include raster size calibrations
 
 
|  
 
|  
 +
|
 
|-
 
|-
| Swing
+
| rowspan="3" | Sunday, August 18
| Production running at 70uA
 
|-style="background: #FCF3CF;
 
| rowspan="3" | Tuesday, August 13
 
 
| Owl
 
| Owl
| Production running at 70uA
 
 
|  
 
|  
|-style="background: #FCF3CF;
 
| Day
 
|
 
# Planned accelerator downtime:Beam studies
 
# Preparations for Transverse Polarized Measurement
 
|
 
|-style="background: #FCF3CF;
 
| Swing
 
| Transverse Polarized Measurement
 
|-
 
| rowspan="3" | Wednesday, August 14
 
| Owl
 
| Transverse Polarized Measurement
 
 
|  
 
|  
 
|-
 
|-
 
| Day
 
| Day
 
|  
 
|  
# Transverse Polarized Measurement
 
# Wein Flip back to `Right'
 
 
|  
 
|  
 
|-
 
|-
 
| Swing
 
| Swing
| Production running at 70uA
+
|  
 +
|
 
|}
 
|}
  

Revision as of 17:08, 14 August 2019



PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Monday, August 12 Owl Production running at 70uA with
Day
  1. Production running at 70uA
  2. Commissioning targets required for Transverse measurements include raster size calibrations
Swing Production running at 70uA
Tuesday, August 13 Owl Production running at 70uA
Day
  1. Planned accelerator downtime:Beam studies
  2. Preparations for Transverse Polarized Measurement
Swing Transverse Polarized Measurement
Wednesday, August 14 Owl Transverse Polarized Measurement
Day
  1. Transverse Polarized Measurement
  2. Wein Flip back to `Right'
  1. Transverse work done at ~10:30.
  2. Hand things off to OPS for beam studies and Wien flip.
Swing
  1. Establish PQB after Wien flip
  2. PITA scan
Production running at 70uA
  1. Caryn checks PQB (at ILD). Done by ~16:30
Thursday, August 15 Owl Production running at 70uA
Day Production running at 70uA
Swing Production running at 70uA
Friday, August 16 Owl
Day
Swing
Saturday, August 17 Owl
Day
Swing
Sunday, August 18 Owl
Day
Swing

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting