Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 159: | Line 159: | ||
| Day | | Day | ||
| Moller | | Moller | ||
− | | | + | | Moller measurement reproduced the previous results, seeing ~2% difference between IHWP IN/OUT. Compton shows the similar difference. |
|- | |- | ||
| Swing | | Swing | ||
| Q2 measurement | | Q2 measurement | ||
− | | | + | | Ran smoothly based on the run plan, measured Qsq for difference Pb targets that were used, initial analysis shows stable Qsq for diff targets. Also took data for C 1% and 40Ca. Wrapped up by midnight. |
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| rowspan="3" | Thursday, August 22 | | rowspan="3" | Thursday, August 22 | ||
| Owl | | Owl | ||
| Production running at 70uA | | Production running at 70uA | ||
− | | | + | | Production running on Pb5. High compton background rates observed (3-3.5kHz). Need to address it after Wien flip. |
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Day | | Day | ||
| Wien flip | | Wien flip | ||
− | | | + | | Beam taken away at 8:30. Mott measurements before Wien flip. <br> MCC will have an access to fix a viewer. Caryn's injector work (IHWP, PC check) in the meantime. |
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Swing | | Swing |
Revision as of 12:11, 22 August 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, August 12 | Owl | Production running at 70uA with | |
Day |
|
||
Swing | Production running at 70uA | ||
Tuesday, August 13 | Owl | Production running at 70uA | |
Day |
| ||
Swing | Transverse Polarized Measurement | ||
Wednesday, August 14 | Owl | Transverse Polarized Measurement | |
Day |
|
| |
Swing
|
Production running at 70uA |
| |
Thursday, August 15 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA |
| |
Friday, August 16 | Owl | Production running at 70uA | Beam off at 7 AM to cool down the hall prior to Compton work |
Day |
|
| |
Swing | Production running at 70uA | No beam due to CHL and Hall B restore | |
Saturday, August 17 | Owl | Production running at 70uA | No beam due to CHL and Hall B restore |
Day | Production running at 70uA |
| |
Swing | Production running at 70uA | ||
Sunday, August 18 | Owl | Production running at 70uA | |
Day | Moller measurement | ||
Swing | Production running at 70uA |
| |
Monday, August 19 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Tuesday, August 20 | Owl | Production running at 70uA | |
Day | Production running at 70uA | ||
Swing | Production running at 70uA | ||
Wednesday, August 21 | Owl | Production running at 70uA | |
Day | Moller | Moller measurement reproduced the previous results, seeing ~2% difference between IHWP IN/OUT. Compton shows the similar difference. | |
Swing | Q2 measurement | Ran smoothly based on the run plan, measured Qsq for difference Pb targets that were used, initial analysis shows stable Qsq for diff targets. Also took data for C 1% and 40Ca. Wrapped up by midnight. | |
Thursday, August 22 | Owl | Production running at 70uA | Production running on Pb5. High compton background rates observed (3-3.5kHz). Need to address it after Wien flip. |
Day | Wien flip | Beam taken away at 8:30. Mott measurements before Wien flip. MCC will have an access to fix a viewer. Caryn's injector work (IHWP, PC check) in the meantime. | |
Swing | Production running | ||
Friday, August 23 | Owl | Production running | |
Day | Production running | ||
Swing | Production running |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting