Difference between revisions of "RunPlanDaily CREX"
From PREX Wiki
Jump to navigationJump to searchLine 14: | Line 14: | ||
| rowspan="3" | Monday, Jan 6 | | rowspan="3" | Monday, Jan 6 | ||
| Owl | | Owl | ||
− | | | + | | |
| | | | ||
|- | |- | ||
| Day | | Day | ||
− | | | + | | |
| | | | ||
|- | |- | ||
| Swing | | Swing | ||
− | | Optics | + | | Moller Lock, FFB low current, Optics |
− | | | + | | Raster issue resolved |
|- | |- | ||
− | | rowspan="3" | Tuesday, | + | | rowspan="3" | Tuesday, Jan 7 |
| Owl | | Owl | ||
− | | Optics | + | | Optics |
− | | | + | | Larm det ul base replaced |
|- | |- | ||
| Day | | Day | ||
− | | | + | | Mott, Spin Dance |
| | | | ||
|- | |- | ||
| Swing | | Swing | ||
− | | | + | | Spin Dance, 150uA to dump |
− | | | + | | |
|- | |- | ||
− | | rowspan="3" | Wednesday, | + | | rowspan="3" | Wednesday, Jan 8 |
| Owl | | Owl | ||
− | | | + | | 150uA, bcm/det calibration, damping measure, bmw initialization...production |
| | | | ||
|- | |- | ||
| Day | | Day | ||
− | | | + | | Tuning through chicane 150uA, FFB recheckout, damping (if measured poor) |
− | | | + | | |
|- | |- | ||
| Swing | | Swing | ||
− | | | + | | If compton locks, compton commissioning. Else, BMW 1H01 tune, production |
|- | |- | ||
− | | rowspan="3" | Thursday, | + | | rowspan="3" | Thursday, Jan 9 |
| Owl | | Owl | ||
− | | | + | | Production |
| | | | ||
|- | |- | ||
| Day | | Day | ||
− | | | + | | Production |
| | | | ||
|- | |- | ||
| Swing | | Swing | ||
− | | | + | |Production |
| | | | ||
|- | |- | ||
− | | rowspan="3" | Friday, | + | | rowspan="3" | Friday, Jan 10 |
| Owl | | Owl | ||
− | | | + | | Production |
| | | | ||
|- | |- | ||
| Day | | Day | ||
− | | | + | | Production |
| | | | ||
|- | |- | ||
| Swing | | Swing | ||
− | | | + | | Production |
| | | | ||
|} | |} |
Revision as of 15:58, 7 January 2020
CREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Comments/Status |
---|---|---|---|
Monday, Jan 6 | Owl | ||
Day | |||
Swing | Moller Lock, FFB low current, Optics | Raster issue resolved | |
Tuesday, Jan 7 | Owl | Optics | Larm det ul base replaced |
Day | Mott, Spin Dance | ||
Swing | Spin Dance, 150uA to dump | ||
Wednesday, Jan 8 | Owl | 150uA, bcm/det calibration, damping measure, bmw initialization...production | |
Day | Tuning through chicane 150uA, FFB recheckout, damping (if measured poor) | ||
Swing | If compton locks, compton commissioning. Else, BMW 1H01 tune, production | ||
Thursday, Jan 9 | Owl | Production | |
Day | Production | ||
Swing | Production | ||
Friday, Jan 10 | Owl | Production | |
Day | Production | ||
Swing | Production |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history CREX
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting