Line 48: Line 48:
 
|-
 
|-
 
| Swing
 
| Swing
| If compton locks, compton commissioning. Else, BMW 1H01 tune, production [https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit Don's Run Plan]
+
|  
 
| Experts: Compton(Dave, Adam, Amali), BMW(Ye,Victoria,Caryn)
 
| Experts: Compton(Dave, Adam, Amali), BMW(Ye,Victoria,Caryn)
 
|-
 
|-
 
| rowspan="3" | Thursday, Jan 9
 
| rowspan="3" | Thursday, Jan 9
 
| Owl
 
| Owl
| Production
+
| Low current BMW tune 1H01 test
|  
+
| Couldn't send beam due to compton rates and
 
|-
 
|-
 
| Day
 
| Day
Line 61: Line 61:
 
|-
 
|-
 
| Swing
 
| Swing
|Production
+
|If compton locks, compton commissioning. Else, BMW 1H01 tune, production [https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit Don's Run Plan]
 
|  
 
|  
 
|-
 
|-

Revision as of 22:27, 9 January 2020



CREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Comments/Status
Monday, Jan 6 Owl
Day
Swing Moller Lock, FFB low current, Optics Raster Iy issue resolved, all same as Dec.
Tuesday, Jan 7 Owl Optics Larm det ul base replaced
Day Mott, Spin Dance Vac gauge readout 1-e12, vac adjacent fine (not urgent, to be fix later)
Swing Spin Dance, 150uA to dump Experts: (Simona, Eric) , (Caryn, Devi)
Wednesday, Jan 8 Owl 150uA, bcm/det calibration, damping measure, bmw initialization...production Experts: Caryn, Devi, Ye
Day Tuning through chicane 150uA, FFB recheckout, damping (if measured poor) Experts: (Yves) Caryn, Adam
Swing Experts: Compton(Dave, Adam, Amali), BMW(Ye,Victoria,Caryn)
Thursday, Jan 9 Owl Low current BMW tune 1H01 test Couldn't send beam due to compton rates and
Day Production
Swing If compton locks, compton commissioning. Else, BMW 1H01 tune, production Don's Run Plan
Friday, Jan 10 Owl Production
Day Production
Swing Production

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history CREX