! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Comments/Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Comments/Status
 
|-
 
|-
| rowspan="3" | Monday, Jan 6
+
|rowspan="3" | Mon Feb 3
| Owl
 
 
|
 
|-
 
| Day
 
 
|
 
|-
 
| Swing
 
| Moller Lock, FFB low current, Optics
 
| Raster Iy issue resolved, all same as Dec.
 
|-
 
| rowspan="3" | Tuesday, Jan 7
 
| Owl
 
| Optics
 
| Larm det ul base replaced
 
|-
 
| Day
 
| Mott, Spin Dance
 
| Vac gauge readout 1-e12, vac adjacent fine (not urgent, to be fix later)
 
|-
 
| Swing
 
|  Spin Dance, 150uA to dump
 
|  Experts: (Simona, Eric) , (Caryn, Devi)
 
|-
 
| rowspan="3" | Wednesday, Jan 8
 
| Owl
 
| 150uA, bcm/det calibration, damping measure, bmw initialization...production
 
| Experts: Caryn, Devi, Ye
 
|-
 
| Day
 
| Hall Access, fix compton T controller. OPS down:RF recovery, NL RF cav gradient, energy loss, broken klystron, failed arc det.
 
|
 
|-
 
| Swing
 
| Tune through chicane attempt, bleed-through from B discovered, returned to straight through end of shift, but compton rates too high
 
| Experts: Compton(Dave, Adam, Amali), BMW(Ye,Victoria,Caryn)
 
|-
 
| rowspan="3" | Thursday, Jan 9
 
| Owl
 
| Low current BMW tune 1H01 test
 
| Couldn't send beam due to compton rates
 
|-
 
| Day
 
| halld laser inj access, bleedthrough B into A injector work prebuncher, chopper.
 
|
 
|-
 
| Swing
 
| compton tuning through chicane...but match into hall was wrong.
 
| Couldn't send beam due to spot size limitations.
 
|-
 
| rowspan="3" | Friday, Jan 10
 
| Owl
 
| Tuning match into Hall
 
|
 
|-
 
| Day
 
| "Production", injector adjustment, injector match
 
|
 
|-
 
| Swing
 
| injector match, hall match, hall on design, lower compton rates straight through, compton chicane tuning attempt ran out of time
 
|
 
|-
 
|rowspan="3" | Sat Jan 11
 
 
|Owl
 
|Owl
|Production, FFB gain issues (hi search limit), yield det decrease and width increase over night
+
| production
 
|
 
|
 
|-
 
|-
 
|Day
 
|Day
|detector alignment check and left dipole current adjustment. Production. LQ1 trip, recycle.
+
| (Hall C spin dance)
|
+
|(Hall C spin dance)
 
|-
 
|-
 
|Swing
 
|Swing
|7:53PM HA to power permit, beam -> C
+
|  
 
|
 
|
 
|-
 
|-
|rowspan="3" | Sun Jan 12
+
|rowspan="3" | Tue Feb 4
 
|Owl
 
|Owl
|(figure out HC feedback again)
 
 
|
 
|
|-
 
|Day
 
|Radcon survey, Compton Laser work
 
|(TO HC feedback )
 
|-
 
|Swing
 
|Compton Laser work
 
|(TO HC feedback )
 
|-
 
|rowspan="3" | Mon Jan 13
 
|Owl
 
 
|
 
|
|(TO HC feedback )
 
 
|-
 
|-
 
|Day
 
|Day
|Vacuum group work ion pump, Compton laser work
 
|(TO HC feedback )
 
|-
 
|Swing
 
|Compton laser work, Hall Lockup, tell OPS PQB checkout in INJ when HA coming back online
 
|(TO HC feedback )
 
|-
 
|rowspan="3" | Tues Jan 14
 
|Owl
 
|Production, 
 
 
|
 
|
|-
 
|Day
 
|Compton chicane tuning, commissioning, Production [https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit Don's Run Plan]
 
 
|
 
|
 
|-
 
|-
 
|Swing
 
|Swing
|BMW fine tune, Production [https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit Don's Run Plan]
+
|
 
|
 
|
 
|-
 
|-
|rowspan="3" | Wed Jan 15
+
|rowspan="3" | Wed Feb 5
 
|Owl
 
|Owl
|Production, 
+
|
 
|
 
|
 
|-
 
|-
 
|Day
 
|Day
|Compton chicane tuning, commissioning, Production [https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit Don's Run Plan]
 
|
 
|-
 
|Swing
 
|BMW fine tune, Production [https://docs.google.com/document/d/1jHNf9rMBiHg8O4Qxlv-vnAy3M-rRdREJ5aRpy5XCO9c/edit Don's Run Plan]
 
|
 
|-
 
|rowspan="3" | Th Jan 16
 
|Owl
 
|Production, 
 
 
|
 
|
|-
 
|Day
 
|Hall C tuning, production
 
 
|
 
|
 
|-
 
|-
 
|Swing
 
|Swing
|Production,
 
 
|
 
|
|-
+
|Moller was scheduled, but postponed
|rowspan="3" | Fr Jan 17
+
Restored beam all shift (BLA calibration, Ion Chamber calibrations)
 +
|-style="background: #FCF3CF;
 +
|rowspan="3" | Thu Feb 6
 
|Owl
 
|Owl
|Compton setup, Production, 
 
|
 
|-
 
|Day
 
|Machine tuning; return to production
 
|
 
|-
 
|Swing
 
 
|Production
 
|Production
 
|
 
|
|-
+
|-style="background: #FCF3CF;
|rowspan="3" | Sat Jan 18
 
|Owl
 
|Production, 
 
|
 
|-
 
 
|Day
 
|Day
 
|Production
 
|Production
 
|
 
|
|-
+
|-style="background: #FCF3CF;
|Swing
 
|Production
 
|
 
|-
 
|rowspan="3" | Sun Jan 19
 
|Owl
 
| Down due to target issue, controlled access
 
|
 
|-
 
|Day
 
| Down due to target issue, controlled access
 
|
 
|-
 
 
|Swing
 
|Swing
| Down due to target issue, controlled access
+
|Production (until 8 PM)
 +
Moller (starting at 8 PM)
 
|
 
|
 
|-
 
|-
|rowspan="3" | Mon Jan 20
+
|rowspan="3" | Fri Feb 7
 
|Owl
 
|Owl
| Down due to target issue, controlled access
+
|Moller
 
|
 
|
 
|-
 
|-
 
|Day
 
|Day
|Down due to target issue, controlled access
 
 
|
 
|
|-
 
|Swing
 
|Down due to target issue, controlled access
 
|
 
|-
 
|rowspan="3" | Tue Jan 21
 
|Owl
 
|Down due to target issue, controlled access
 
|
 
|-
 
|Day
 
|Down due to target issue, controlled access
 
 
|
 
|
 
|-
 
|-
 
|Swing
 
|Swing
|Down due to target issue, controlled access
 
|
 
|-
 
|rowspan="3" | Wed Jan 22
 
|Owl
 
|Down due to target issue, controlled access
 
 
|
 
|
|-
 
|Day
 
|Down due to target issue, controlled access
 
|Ca40, Ca48 target reinstalled
 
 
|
 
|
 
|-
 
|-
|Swing
+
|rowspan="3" | Saturday Feb 8
|
 
|
 
|-
 
|rowspan="3" | Thu Jan 23
 
 
|Owl
 
|Owl
 
|
 
|
Line 240: Line 85:
 
|-
 
|-
 
|Day
 
|Day
| Target cooldown
 
|
 
|-
 
|Swing
 
| Beam restoration, target commissioning, detector alignment check, Qsq measurement
 
|
 
|-
 
|rowspan="3" | Fri Jan 24
 
|Owl
 
| BMW check, target thermal commissioning
 
 
|
 
|
|-
 
|Day
 
| Production!
 
 
|
 
|
 
|-
 
|-
 
|Swing
 
|Swing
| Production!
 
|
 
|-
 
|rowspan="3" | Sat Jan 25
 
|Owl
 
|
 
|
 
|-
 
|Day
 
|
 
|
 
|-
 
|Swing
 
|
 
|
 
|-
 
|rowspan="3" | Sun Jan 26
 
|Owl
 
|
 
|
 
|-
 
|Day
 
|
 
|
 
|-
 
|Swing
 
|
 
|
 
|-
 
|rowspan="3" | Mon Jan 27
 
|Owl
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Day
+
|rowspan="3" | Sunday Feb 9
| Moller measurement
 
|
 
|-
 
|Swing
 
| Moller measurement
 
|
 
|-
 
|rowspan="3" | Tue Jan 28
 
 
|Owl
 
|Owl
 
|
 
|
Line 305: Line 98:
 
|-
 
|-
 
|Day
 
|Day
|
 
 
|
 
|
|-
 
|Swing
 
|
 
|
 
|-
 
|rowspan="3" | Wed Jan 29
 
|Owl
 
|
 
|
 
|-
 
|Day
 
|
 
 
|
 
|
 
|-
 
|-
 
|Swing
 
|Swing
|
 
|
 
|-
 
|rowspan="3" | Thu Jan 30
 
|Owl
 
 
|
 
|
|
 
|-
 
|Day
 
|
 
|
 
|-
 
|Swing
 
|
 
|
 
|-style="background: #FCF3CF;
 
|rowspan="3" | Fri Jan 31
 
|Owl
 
|
 
|
 
|-style="background: #FCF3CF;
 
|Day
 
| production
 
|
 
|-style="background: #FCF3CF;
 
|Swing
 
| production
 
|
 
|-
 
|rowspan="3" | Sat Feb 1
 
|Owl
 
|production
 
|
 
|-
 
|Day
 
| production
 
|
 
|-
 
|Swing
 
| production
 
|
 
|-
 
|rowspan="3" | Sun Feb 2
 
|Owl
 
|production
 
|
 
|-
 
|Day
 
| Moller measurment
 
|
 
|-
 
|Swing
 
| Moller measurment
 
|
 
|-
 
|rowspan="3" | Mon Feb 3
 
|Owl
 
| production
 
|
 
|-
 
|Day
 
| (Hall C spin dance)
 
|(Hall C spin dance)
 
|-
 
|Swing
 
|
 
 
|
 
|
 
|-
 
|-

Revision as of 01:02, 6 February 2020



CREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Comments/Status
Mon Feb 3 Owl production
Day (Hall C spin dance) (Hall C spin dance)
Swing
Tue Feb 4 Owl
Day
Swing
Wed Feb 5 Owl
Day
Swing Moller was scheduled, but postponed

Restored beam all shift (BLA calibration, Ion Chamber calibrations)

Thu Feb 6 Owl Production
Day Production
Swing Production (until 8 PM)

Moller (starting at 8 PM)

Fri Feb 7 Owl Moller
Day
Swing
Saturday Feb 8 Owl
Day
Swing
Sunday Feb 9 Owl
Day
Swing

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history CREX
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting