Difference between revisions of "WAC Notes February 2 2020"

From PREX Wiki
Jump to navigationJump to search
 
Line 39: Line 39:
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6135_000 Run 6135]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6135_000 Run 6135]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6136_000 Run 6136]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6136_000 Run 6136]
 +
continue slug 127 on [https://prex.jlab.org/wiki/index.php?title=WAC_Notes_February_3_2020 February 3]:
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==

Latest revision as of 16:10, 4 February 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes February 1 2020 << >> WAC Notes February 3 2020

February 2 2020

Daily Meeting BlueJeans


Production Run List - Slug 126 - IHWP IN - Flip-RIGHT - Production

continue slug 126 from February 1:


Production Run List - Slug 127 - IHWP OUT - Flip-RIGHT - Production

this slug at about 4 am

continue slug 127 on February 3:

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • very large asym_bpm2i01WS_mean in slug 127: ~13.8 ppm (compared to previous value of < 5 ppm)
  • due to work in arc 8 box supply, no beam at all during the day and swing shift, beam comes back at about 21:30; but beam spot size tuning and compton work blocks production until 1:45 am the next day

Updates