Difference between revisions of "WAC Notes February 2 2020"
From PREX Wiki
Jump to navigationJump to search (→Issues) |
|||
Line 39: | Line 39: | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6135_000 Run 6135] | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6135_000 Run 6135] | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6136_000 Run 6136] | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6136_000 Run 6136] | ||
+ | continue slug 127 on [https://prex.jlab.org/wiki/index.php?title=WAC_Notes_February_3_2020 February 3]: | ||
== Non-Production Runs and Bad Runs == | == Non-Production Runs and Bad Runs == |
Latest revision as of 16:10, 4 February 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes February 1 2020 << >> WAC Notes February 3 2020
February 2 2020
Daily Meeting BlueJeans
Production Run List - Slug 126 - IHWP IN - Flip-RIGHT - Production
continue slug 126 from February 1:
Production Run List - Slug 127 - IHWP OUT - Flip-RIGHT - Production
this slug at about 4 am
continue slug 127 on February 3:
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
Issues
- very large asym_bpm2i01WS_mean in slug 127: ~13.8 ppm (compared to previous value of < 5 ppm)
- due to work in arc 8 box supply, no beam at all during the day and swing shift, beam comes back at about 21:30; but beam spot size tuning and compton work blocks production until 1:45 am the next day