Difference between revisions of "WAC Notes January 27 2020"

From PREX Wiki
Jump to navigationJump to search
m
 
Line 33: Line 33:
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5966_000 Run 5966]  
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5966_000 Run 5966]  
  
=== Production Run List - Slug 119 - IHWP IN - Flip-RIGHT - Production ===
+
=== Production Run List - Slug 120 - IHWP IN - Flip-RIGHT - Production ===
  
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5967_000 Run 5967] - good
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5967_000 Run 5967] - good
Line 39: Line 39:
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5969_000 Run 5969] - another minor beam excursion in the middle of the run, but OK
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5969_000 Run 5969] - another minor beam excursion in the middle of the run, but OK
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5970_000 Run 5970]  
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5970_000 Run 5970]  
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5971_000 Run 5971]  
+
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5971_000 Run 5971]
 
 
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==

Latest revision as of 15:00, 28 March 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 26 2020 << >> WAC Notes January 29 2020

January 27 2020

Daily Meeting BlueJeans

Production Run List - Slug 119 - IHWP OUT - Flip-RIGHT - Production

Production Run List - Slug 120 - IHWP IN - Flip-RIGHT - Production

  • Good - Run 5967 - good
  • Good - Run 5968 - a minor beam excursion in the middle of the run, but OK
  • Good - Run 5969 - another minor beam excursion in the middle of the run, but OK
  • Good - Run 5970
  • Good - Run 5971

Non-Production Runs and Bad Runs

  • Good? Too short - Run 5972 very small run, but good, with BMW. I think this run was too short to have all the epics variables in it, as such marking as suspicious (it should be good for BMW analysis though hopefully)

Pedestal/Calibrations Updates

Issues

  • Residual Aq correlation in HRS sometimes
  • Large noise in RHRS main det (pedestal noise?)
  • Low beam current
  • Need calibrations again
  • BCM sees noise off the Hall A laser sometimes -> how much, % of experiment data cut?

Updates