Difference between revisions of "WAC Notes February 15 2020"

From PREX Wiki
Jump to navigationJump to search
(Created page with "No production data. Waiting for HALL B pass change. We got beam into the hall only half way through the Swing shift and production quality beam only at the end of the shift.")
 
m
Line 1: Line 1:
 
No production data. Waiting for HALL B pass change. We got beam into the hall only half way through the Swing shift and production quality beam only at the end of the shift.
 
No production data. Waiting for HALL B pass change. We got beam into the hall only half way through the Swing shift and production quality beam only at the end of the shift.
 +
[[Category:WAC]]

Revision as of 15:06, 28 March 2020

No production data. Waiting for HALL B pass change. We got beam into the hall only half way through the Swing shift and production quality beam only at the end of the shift.