Difference between revisions of "WAC Notes January 31 2020"
From PREX Wiki
Jump to navigationJump to search (→Issues) |
|||
Line 27: | Line 27: | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6085_000 Run 6085] | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6085_000 Run 6085] | ||
* Need cut - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6086_000 Run 6086]: large bcm asym due to issue in the injector, cut out events whose asym_bcm > 500 ppm | * Need cut - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6086_000 Run 6086]: large bcm asym due to issue in the injector, cut out events whose asym_bcm > 500 ppm | ||
+ | ** Later: decide to remove cut (not a big deal), marked as good | ||
* Need cut - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6087_000 Run 6087]: same as run 6086 | * Need cut - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6087_000 Run 6087]: same as run 6086 | ||
+ | ** Later: decide to remove cut (not a big deal), marked as good | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6089_000 Run 6089] | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6089_000 Run 6089] | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6090_000 Run 6090] | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6090_000 Run 6090] |
Revision as of 23:10, 21 April 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes January 30 2020 << >> WAC Notes February 1 2020
January 31 2020
Daily Meeting BlueJeans
Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production
continue slug 121 from January 29:
- Good - Run 6085
- Need cut - Run 6086: large bcm asym due to issue in the injector, cut out events whose asym_bcm > 500 ppm
- Later: decide to remove cut (not a big deal), marked as good
- Need cut - Run 6087: same as run 6086
- Later: decide to remove cut (not a big deal), marked as good
- Good - Run 6089
- Good - Run 6090
Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production
start the new slug at ~ 7 am
- Good - Run 6091
- Good - Run 6093
- Good - Run 6094
- Good - Run 6098
- Good - Run 6099: a little large bcm asym, but is ok
continue slug 122 on February 1
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
BeamMod Commissioning calibration runs: 6076 - 6084
Issues
- There are some issues in the injector, resulting in large bcm asym in two runs (6086, 6087)
- run 6087: after cut, there are still some miniruns with large injector asym in asym_bpm2i01WS, should I cut them out?
- quite large bcm asym (324 ppm) in run 6099, don't know why. the asym in injector asym_bpm2i01WS is quite large: -8.67 compare to grand average value (< 5ppm)
- slug 122: quite large asym. in bpm2i01WS_mean: -7.127 (usually < 5) ppm